顶进过程(Jacking process).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
顶进过程(Jacking process)

顶进过程(Jacking process) A brief introduction to the method: The construction process of drilling pipe method The geological survey, through the curve design, measuring the magnetic azimuth, and driller drill guide hole, reaming, dragging, environmental protection, landscape restoration The working principle of drilling pipe method The working principle of horizontal directional drill is: in the construction, in accordance with the drilling trajectory design (usually curved), drill a hole can be used to guide the approximate horizontal drilling rig from the surface, then the guide bit changed after the large diameter drill hole and drill head diameter less than to be laying pipeline. Then reverse reaming, will also pull back into the pipeline to be laid in the borehole, when all the drill was towed back to work at the same time, the pipe laying is completed. This project adopts graded reaming according to the geological conditions, is divided into 2 hole, back to the method of pipeline crossing construction of drag. The equipment in place, installation and debugging. On the construction site of smooth driller before (20m * 30m), to ensure that equipment and import traffic field. Equipment and material storage area must be higher than the natural ground of not less than 15cm, leveling, compaction, side ditch and cross section of not less than 0.3m * 0.3m. Lay the axis line, combined with the actual situation according to the angle, the buried buried drill accurately in place. Rig equipment, equipment, mud solid control equipment after installation, commissioning, inspection, testing equipment, to ensure the safe operation of equipment. To control the equipment after installation, debugging, to ensure the accuracy of the guide hole. At the end of the mud pit and buried (2m * 4m * 2m) and the end of the mud pit unearthed storage (2m * 3M * 2m). The excess mud centralized removal by suction sewage truck. Slurry storage pit (2m * 4m * 2m) and the end of the mud pit unearthe

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档