高层施工(The high-rise construction).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高层施工(The high-rise construction)

高层施工(The high-rise construction) The following is the development project on $= /, real estate limited commercial building project, located in the city at all - ^ 21# Avenue, from the main building (A, B two), foundation and basement. The total land area of the project is 7456.91m2, and the total construction area is 20378.19m2. A building 11 floors on the ground (including the top layer), B Building 1 floor underground and 15 floors on the ground (including the top layer), are the main cast frame shear wall structure, the foundation of pile foundation; laying underground 1 floors, 3 floors on the ground, the main cast-in-situ frame structure, foundation pile base. The B building and the mall is usually negative a layer of underground garage, the wartime air defense projects, the height is 4.7m; A building B building and podium a ~ three layers of shopping malls, high starting from + 0 respectively: 5.7m, 4.8m, 4.8m; A, B, building four layer and four layer above residential standard, high-level 3.0m and A building eaves height 42m, total building height of 45m, B building eaves height 51m, total building height of 54m. Shopping mall eaves 15.250m, building height 18.250m. 2.1 familiar with design drawings, carefully check the size relationship between the drawings. Before setting up, the following drawings are required: general plan, building plan, basic plan and so on. 2.2 site visit. Comprehensive understanding of the site and the owner of the given site, plane control points and elevation control points for inspection and necessary inspection. 2.3 establish the design plan. According to the design requirements, location conditions, the topography of the site and the construction scheme and other factors, making survey and design scheme, including surveying method, surveying data calculation and checking, measurement error analysis and adjustment, drawing surveying sketch etc.. 2.4 conduct preliminary division of labor among the personnel involved in the measurem

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档