网站大量收购独家精品文档,联系QQ:2885784924

第三章 基础工程(The third chapter of foundation engineering).doc

第三章 基础工程(The third chapter of foundation engineering).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第三章 基础工程(The third chapter of foundation engineering)

第三章 基础工程(The third chapter of foundation engineering) The third chapter, foundation engineering The hydraulic structure is very strict to the foundation, and the natural ground often needs to be processed artificially. The foundation project is a hidden project, and the quality of the treatment should be guaranteed. The emphasis of this chapter is as follows: (1) the requirements of the hydraulic structures to the ground and the commonly used treatment methods. Based on the classification of hydraulic structures according to the nature of the strata can be divided into two types: the batholith; the soft base (including soil and sand gravel foundation). Section 1 Foundation Excavation This section focuses on the basic requirements of rock excavation; the rock excavation quality control measures. I. requirements of hydraulic structures for foundations: The basic requirements of various types of hydraulic structures for foundation are: 1) having sufficient strength to withstand the stresses transmitted by the superstructure; 2) having sufficient integrity and uniformity to prevent foundation sliding and uneven settlement; 3) have enough impermeability to avoid serious seepage and seepage damage; 4) sufficient durability to prevent erosion and damage in the long run of ground water. Two, rock excavation should pay attention to the problem (1) timely control of water seepage in the foundation pit, seepage and surface water, so as to ensure that excavation work is conducted without interference from water. The excavation of the bank slope should pay great attention to the removal of surface water, and repair the drainage ditch at the periphery of the excavation to guide the surface water. The channel part of the excavation, to arrange a good water drainage system, equipped with mobile pumps convenient, timely water, water seepage. (2) reasonable arrangement of excavation procedures to ensure construction safety. (3) overall planning of transportation lines, organization

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档