车间工作管理流程(Workshop management process).doc

车间工作管理流程(Workshop management process).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
车间工作管理流程(Workshop management process)

车间工作管理流程(Workshop management process) First, ensure that the equipment maintenance quality process: 1, reasonable collocation, specified responsibility. 2, the data must be accurate, measurement records must be written. 3, hot oil pump in the overhaul, preheating 100 C and 200 c, 280 C and 350 C hot. 4, maintenance records signed after the afternoon before work with the workshop, the workshop leaders continue to cycle to sign, after the hand tracking. 5, the maintenance records of each item must be comprehensive, and monitor by the workshop, by Wei Chenggang inspection statistics. 6, the existence of hidden equipment, do not have the conditions of processing, by filing a memo to monitor, after the repair out. The handle 7, equipment problems, must be timely feedback to the workshop staff on duty. 8, the key equipment maintenance after the test machine, there must be a deputy class above personnel responsible for. Two, the equipment maintenance plan: 1, large, medium and small in time and maintenance according to the memo, maintenance details. 2, the relevant plan in accordance with the provisions of the format is completed, by the monitor to the workshop, approved the implementation of audit. 3, the organization plans to overhaul the workshop before the safety plan of study and training. Three, equipment inspection process: 1, must ensure that the inspection team every day four times, inspection tools must be equipped with complete. The collective inspection daily at eight am to four PM between Lu Xun, effective once the monitor arrangement. Must check the quality inspection 2, monitor every day, on-site check table. 3, the monitoring equipment must be repaired within 24 hours, by the person responsible for the arrangement of monitor. 4, inspection must ensure that time, eliminate the hillock, monitor check. 5, every Monday to receive the inspection record. 6, workshop management personnel inspection of key equipment. 7, check the inspection personnel on duty that d

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档