C130运输机装载的设备.pdfVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
C130运输机装载的设备.pdf

Royal Air Force C130K CMk3 Avionics Upgrade Programme Sqn Ldr Ian Rillie - Hercules IPT Room V012, Palmer Pavilion RAF Wyton, Huntingdon, Cambs, Tel +(44)1480 52451 Ext 4555 E-mail: 130-ksystems@esair.dlo.mod.uk 1 Royal Air Force C130K CMk3 Avionics Upgrade Programme • Requirement was to carry out avionics upgrade to 6 C130K CMk3 ac to a similar or better standard as current CMk1 ac. – Upgrade was originally an EP Option which was then accelerated and carried out as an Op Veritas Urgent Operational Requirement – Embodiment work was carried out by Marshall Aerospace (MA) at Cambridge – Authority to proceed was given on 11 December 2002 – First 3 ac were delivered by 1 April 2003 2 Royal Air Force C130K CMk3 Avionics Upgrade Programme • In that time the IPT and MA had to: – Source and procure the equipment to be fitted • Equipment was supplied to MA as GFE – Design modifications for each equipment • Taking into account design and equipment differences from CMk1 ac – Integrate and test all of the new modifications – Obtain appropriate flight clearances from QinetiQ (UK Independent Test Evaluation Agency) 3 Royal Air Force C130K CMk3 Avionics Upgrade Programme • Aircraft to be modified in 2 Phases, main difference being new ac Intercom System: – Phase I (ac 1 – 3) – Retain Current Intercom System – Phase II (ac 4 – 6) – New Secure Digital Intercom System – All work for this UOR carried out by MA on a 24 hr – 7 day week basis – All 6 ac have now been delivered to the R

文档评论(0)

jackzjh + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档