20012复习题(20012 review questions).docVIP

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
20012复习题(20012 review questions)

20012复习题(20012 review questions) A glossary: (3 points every day a total of 15 points) The railway bridge bridge of long span bridge; net; viaduct; swivel construction method of arch bridge; hole construction method of precast beam by friction pile; skeleton construction method of arch bridge; span girder bridge: low pile cap: lateral eccentricity of the pier; Two questions: (30 points, 3 points for each item) 1. when the cable crane hoisting the arch ring, the role of the buckle is. 2. the post tensioned prestressed concrete beam designed by the railway standard has a span of,,, Four kinds. 3., Chinas Provisional Regulations on the design of newly built railway passenger and freight collinear railways with speed of 200 kilometers require that the live load on the trains vertical and static live load is adopted,. The high-speed railway adopts live load. 4. span 31.5m speed 350km/h passenger dedicated line double line simply supported box girder, beam height meter, Liang Kuan Meters, beams, meters, beams, tons of weight. The 5. arch bridges can be divided into three sections according to the form of the main arch ring,, ,. 6. the hydraulic jack used in the tensioning of the prestressing tendon of the post tensioned prestressed concrete beam is classified according to its construction And three kinds. 7, the passenger dedicated beam, beam system, field beam equipment mainly,,. 8. The main arch ring of the double curved arch bridge is composed of, And four parts. When the river bends 9. pier design, flow instability should be used when the valley bridge pier; pier should be selected; when the oblique flow velocity is greater than 15 degrees C. pier. 10 、 the construction method of prestressed concrete continuous beam bridge,, And so on. 11, the type of drilling rig used by bored piles,, Three types. 12, caisson construction steps include . 13, the structure of the high-speed railway or passenger dedicated line bridge has been built: the adoption of small span bridges T

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档