网站大量收购独家精品文档,联系QQ:2885784924

epc模式下项目的质量控制(The quality control mode of EPC project).doc

epc模式下项目的质量控制(The quality control mode of EPC project).doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
epc模式下项目的质量控制(The quality control mode of EPC project)

epc模式下项目的质量控制(The quality control mode of EPC project) Abstract: some large projects in the complex, involving a wide area, and the project of huge investment, long construction period, high quality requirements, the project contract management model because the traditional limitation is difficult to meet the quality, schedule, cost target needs, need to adopt the corresponding management model to achieve. In recent years, with the domestic construction industry gradually with international standards, more and more construction enterprises to enter the international market, from the experience of foreign project management, general contracting mode of a new -EPC contract mode has been widely used. Key words: EPC, EPC, quality, control, management Preface: EPC (Engineering Procurement Construction) project refers to the project general contracting enterprises in accordance with the contract, to undertake the project design, procurement, construction and commissioning work, project contracting and quality, safety, schedule, cost is fully responsible for the general contracting project, also called turnkey project. In the face of the update cycle is shortened and the pressure of market competition increasing, ordering the owners of the project focus from traditional C (cost), P (quality, performance, function), T (time) to T (time), P (quality, performance, function), C (cost), the owners of investment the purpose is to obtain the expected investment benefit, more concerned about the operation stage of the project. Therefore, the owner expects the contractor to contract the project with a fixed lump sum price so as to allow the contractor to bear most of the risks in the project. In recent years, many domestic construction enterprises continue to learn from foreign countries especially developed countries experience in project management, project management maturity and perfection, EPC contracting mode gradually by some construction enterprises at home. In the EPC gene

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档