网站大量收购独家精品文档,联系QQ:2885784924

《水利工程施工》试题(c)(The construction of water conservancy project test (c)).doc

《水利工程施工》试题(c)(The construction of water conservancy project test (c)).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《水利工程施工》试题(c)(The construction of water conservancy project test (c))

《水利工程施工》试题(c)(The construction of water conservancy project test (c)) The construction of water conservancy project test (C) Class name: Student ID score Explain the following terms: 1. (1 points each, a total of 10 points) Water conservancy engineering, water conservancy, water conservancy project construction, finite medium blasting, explosive force, brisance, construction diversion, construction of closure, closure and construction organization design. Two. Fill in the blanks: (each 0.5 points, a total of 60 points) 1. water conservancy engineering construction organization and management should be in accordance with the (-, -, -, -, -) principle. 2.. Dry fill construction of roller compacted dam to content generally includes (-, -, -, -) operation. The 3. general soil level, which consists of (-) (-) level of soil. 4. the main factors affecting the soil compaction effect is (-, -, -). 5. methods are commonly used in blasting initiation (-, -, -, -, -) initiation method. 6. steel processing includes (-, -, -, -, -, -) etc.. 7. bars in the construction of the substitution should follow (-, -, -, -, -) principle. 8. concrete floor by (-, -, -, -, -). The process of concrete construction including 9. (-, -, -, -) 10. dam yard planning should be mainly from (-, -, -, -) comprehensive etc... The basic procedure of construction dam is 11. (-, -, -, -, -, -). The general steps of 12. masonry construction is (-, -, -, -, -, -, -, -). 13. arrange the concrete sluice construction should be in accordance with the general order (-, -, -, -) principle. The basic construction sequence of tunnel blasting excavation is 14. (-, -, -, -, -, -, -, -, -, -). 15. tunnel lining the effect of (-, -, -, -). 16. tunnel bolting, anchor parameters is generally divided into two categories, one is the anchor itself, such as (-, -, -), two is the installation, such as (-, -, -). 17. general construction diversion (-, -) diversion method. 18. construction closure generally includes (-, -, -, -

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档