中国联塑 pvc管道安装施工方案(The installation and construction scheme Chinese Liansu PVC pipeline).doc
- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国联塑 pvc管道安装施工方案(The installation and construction scheme Chinese Liansu PVC pipeline)
中国联塑 pvc管道安装施工方案(The installation and construction scheme Chinese Liansu PVC pipeline)
I. matters needing attention in construction
1, pipeline installation construction, shall meet the following conditions: first, design drawings and other technical requirements for the proper range, the construction scheme and construction organization has been recognized and implemented; secondly, construction materials, construction tools and equipment are ready, can guarantee the normal construction.
2, construction personnel according to the design requirements for construction, modify the design must have design unit approval document, strictly prohibited without approval of unauthorized change.
3, before construction, should check the quality of materials, specifications and quantity, the product should meet the current product standards, with quality inspection department product qualification certificate, parts and pipe model matching.
The horizontal distance between the 4 and PVC-U water supply pipelines and other adjacent pipelines shall not be less than the width of the construction and maintenance requirements and the width required by the auxiliary structures such as gate wells. The horizontal net distance between hot water pipes, such as high temperature pipes and high-pressure gas pipes shall not be less than 1 or 5m. Drinking water pipes shall not be laid beneath drains and sewers.
5, PVC-U pipe line and building wall (column) skin between the horizontal distance should be less than the following provisions: nominal outer diameter DN is not greater than 200mm when 1, 0m; nominal outside diameter DN is greater than 200mm, 3, 0m.
6 and PVC-U pipes shall not pass through buildings. When necessary, reliable protection measures, such as additional casing, shall be taken.
7, when the design does not specify, PVC-U pipe shall not use 360 degrees full packet concrete for foundation treatment, or enhance the pipeline carrying capacity.
8, under the road, the pipe top buried
您可能关注的文档
- 《机械设计》考试试题有答案(Mechanical design exam answer).doc
- 《探索月球奥秘》综合性学习案例(To explore the moon mystery comprehensive case study).doc
- 《机械设计基础 》教学大纲(The outline of mechanical design basis).doc
- 《材料科学基础》习题 - 广东工业大学精品课程网站(Basic materials science Guangdong University of Technology exercises course website).doc
- 《操作系统》练习(Operating system in practice).doc
- 《构造地质学》教学大纲(The outline of structural geology).doc
- 《模具制造技术》理论课程教学大纲(The outline of die manufacturing technology course).doc
- 《案例分析》全真模拟题(Case analysis simulation tests).doc
- 《民法学1》形成性考核册答案(Civil law 1 formative assessment book answer).doc
- 《沉积岩与沉积相》2014年春学期在线作业(一)(Sedimentary rocks and sedimentary facies 2014 spring semester online homework (a)).doc
- 湖北荆州2024-2025学年九年级下学期3月月考数学试题+答案.pdf
- 日语试卷+答案【浙江卷】浙江省强基联盟2025届高三下学期5月联考(5.7-5.9).pdf
- 初中全科目《期中模拟卷》人八英期中(含答案或解析).pdf
- 地坪技术标准及管控要求培训考试题及答案.docx
- 2025年运营管理制度培训试卷含答案.docx
- 四年级德育测试卷.docx
- 非车核保单选试卷含答案.docx
- 2025年绍兴市药械检查员业务素质能力提升暨药品流通继续教育试卷含答案.docx
- 陆军军医大学第二附属医院护理实习2024年第四季度院级理论考试题及答案.docx
- 中医执业2023模拟卷-600题第三单元测试题及答案.docx
文档评论(0)