北语13春学期《土木工程定额与预算》在线作业3(No. 13 spring semester civil engineering quota and budget online homework 3).docVIP

北语13春学期《土木工程定额与预算》在线作业3(No. 13 spring semester civil engineering quota and budget online homework 3).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
北语13春学期《土木工程定额与预算》在线作业3(No. 13 spring semester civil engineering quota and budget online homework 3)

北语13春学期《土木工程定额与预算》在线作业3(No. 13 spring semester civil engineering quota and budget online homework 3) 13 spring semester civil engineering quota and budget online homework 3 Total score: 100 test time: - Radio examination A multiple-choice question Judgment question Radio examination questions (10 questions, 50 points) One The main reason for the workload of drawing up construction plans by physical method is larger than the method of unit price. The data collected by A. are different, and the rules of B. engineering quantity calculation are different The quota used by C. is different, and the method of calculating direct charge in D. is different A. B. C. D. Full marks: 5 Two In accordance with the current regulations, the former fees should be () canceled. A. pollution discharge fee B. engineering quota measurement fee C. social security fee D. dangerous operations accidental injury insurance A. B. C. D. Full marks: 5 Three The document of completion settlement is identical with the final accounting document of completion A. compilation time B. compilation units C. reflects the content, nature and role of D. A. B. C. D. Full marks: 5 Four When the preliminary design reaches a certain depth and the structure of the building is relatively clear, it is advisable to adopt () the budget estimate for the construction project. A. budget unit price method; B. budget estimate index method C. similar engineering budget law D. expanded unit price method A. B. C. D. Full marks: 5 Five In the following units of measurement, the estimated quota shall not be adopted. A. m3 B. M2 C. block D. yuan A. B. C. D. Full marks: 5 Six To consider all the immediate consumption of the construction site for the completion of a particular project, which is the principle of the budget quota preparation principle. A. the average level of the whole society is B., the average advanced level of the whole society C. rigorous and accurate, D. content complete A. B. C. D. Full marks: 5 Seven In the fe

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档