- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
半硬质阻燃型塑料管暗敷设工程(Flame retardant semi-rigid plastic pipe laying in the dark)
半硬质阻燃型塑料管暗敷设工程(Flame retardant semi-rigid plastic pipe laying in the dark)
Semi rigid flame retardant plastic pipe concealed laying project
This chapter applies to lighting works in general civil buildings and shall not be laid in hot places and ceilings.
1. material requirements
1.1 flame retardant plastic pipes and their accessories, their oxygen index shall comply with fire code requirements, and have product qualification certificate.
The wall 1.2 flame retardant plastic pipe should be uniform thickness, no bubbles and the tube body deformation phenomenon.
1.3, switch box, socket box, junction box and other plastic boxes, boxes should be neat appearance, open hole and no split phenomenon.
1.4 galvanized material: flat iron, wood screws, machine screws and so on.
1.5 auxiliary materials: galvanized wire, anticorrosive paint, adhesive, cement, sand etc..
2. main machines and tools
2.1 pencils, tape measure, horizontal ruler, line drop, bucket, ash bucket, ash shovel.
2.2 hand hammer, chisel, hacksaw blade, saws, rasps, etc..
2.3 bench drill, electric drill, drill, wood drill, tool bag, toolbox, stool etc..
3. operating conditions
3.1, with the civil structure, construction, according to brick wall, aerated wall good horizontal line, the installation of boxes, boxes and pipes.
3.2, with the construction of civil engineering, construction of large formwork, slide formwork construction of concrete wall, in the process of reinforcement binding, embedded boxes and pipes
Handle hidden inspection.
3.3 aerated concrete slabs, hollow plates for piping shall be adjusted with civil lifting floor slab at.
4. operation process
Technological process:
Elastic line location: box, box, fixation, piping laying, sweeping and threading
4.1 wire positioning
(1) wall box and box line positioning;
Brick wall, large formwork, concrete wall, sliding formwork, concrete wall box, box and cable line positioning, according to the horizontal line of the pop-up, the design drawings with small l
您可能关注的文档
- 兰大《工程力学》13春在线作业2(Lanzhou Engineering Mechanics 13 spring online homework 2).doc
- 共享权限和ntfs权限(Share and NTFS permissions).doc
- 关注颈椎预防,让颈椎病无孔可钻(Pay attention to prevention of cervical spondylosis cervical spine, so that no holes can be drilled).doc
- 关注业扩报装工作的时效性、规范性(Pay attention to timeliness, expanding the standardization of work).doc
- 关中(Guanzhong).doc
- 兵马俑的主人根本不是秦始皇(The owner of the Terracotta Army is not the emperor).doc
- 其它有害物质检测(Detection of other hazardous substances).doc
- 关闭服务,让系统运行顺畅(Close the service, let the system run smoothly).doc
- 具有抵偿高程面的任意带坐标系设计原理与方法(With the principle and method of coordinate system for elevation plane design).doc
- 养好脾脏改善循环抵抗身体衰老(Keep a good body resistance aging improve circulation spleen).doc
文档评论(0)