施工管理重点(The construction management focus).docVIP

施工管理重点(The construction management focus).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工管理重点(The construction management focus)

施工管理重点(The construction management focus) 1, the construction project quality management should be fully responsible for: Construction Project Manager 2, the objective reason of the difficulty of construction quality control is mainly because the production of construction products is single and mobile 3, the quality of construction process control requirements are high, mainly because of the production process of construction products, more processes, more hidden projects 4. The limitation of final inspection of construction quality mainly lies in the fact that the internal quality can not be checked by disassembly or disassembly 5, the basic starting point of construction quality control is the controllers factors 6, in the construction quality factors, ensure the quality of the project is an important basis for strengthening the control of material factors 7, the quality of an engineering project should be reflected in: Quality of the project itself The quality of the activities or processes associated with an engineering project Quality of the quality management system 8, construction quality control features are mainly in: There are many control factors It is difficult to control The requirement of process control is high Limitations of final examination 9, in the construction quality of the five major factors, the method of the main factors for: Construction technical scheme Construction technology Construction technical measures 10, the construction quality assurance system operation PDCA cycle principle is: plan, implementation, inspection, processing 11. The quality management system document of construction enterprise is mainly composed of quality management manual, procedure document, quality plan and quality target 12, the project quality assurance system, the project quality objectives are based on the decomposition of: engineering contract 13, the enterprise quality management system approved certification is valid for 3 years 14, the main contents of

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档