- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
预制水磨石地面施工艺标准(707-1996)(Standard for precast terrazzo floor (707-1996))
预制水磨石地面施工艺标准(707-1996)(Standard for precast terrazzo floor (707-1996))
Standard for precast terrazzo floor (707-1996)
Range
This technology standard is applicable to the precast terrazzo floor engineering of industrial and civil buildings.
Construction preparation
2.1 materials and main equipment:
2.1.1 cement: more than 425 ordinary portland cement or slag Portland cement, have the factory certificate.
White cement: Portland cement, marking no less than 425.
2.1.2 sand: coarse sand or medium sand, containing more than 3% of the mud.
2.1.3 precast slab: should have the certificate, a mark of each plate, according to the specifications, size and colour of the inspection and acceptance requirements and processing orders, respectively (standing) stacked on the spacer. In order to prevent plate deformation, should be stored in the warehouse, to avoid strong sunlight exposure.
See table 7-7 for requirements of terrazzo plate.
Terrazzo plate material requirements table 7-7
Allowable deviation (mm)
Maximum length, width, thickness, flatness, maximum deviation
Length:
Terrazzo plate more than 4001 stone surface requires uniform, uniform color, no twistcore, stomata
More than 8002
2.1.4 gypsum powder, wax, oxalic acid.
2.1.5 main equipment: mortar mixer, grinder, grinding wheel saw, 45 grit wheel, wood trowel, wood scraping bars, on foot, foot level, rubber hammer, 90 small line steel square, broom etc..
2.2 operating conditions:
2.2.1 the interior walls are plastered and the frames are finished.
2.2.2 wall has been played well, +50cm horizontal line.
2.2.3 through the floor of the pipe hole has been blocked solid plug.
2.2.4 buried in the ground, wire pipes have been laid out, and finished hidden acceptance procedures. The ground cushion has been finished, and its strength is above 1.2MPa.
Check the 2.2.5 before laying precast slab color, specifications, size meets the design requirements, and selected, there will be cracks, off angle, angle channeling and warpage of the pl
您可能关注的文档
- 非有害物品与废物管理.doc
- 非织造布用纤维和其产品应用.doc
- 隔离霜和防晒霜区别.doc
- 需要打印材料分析.doc
- 面向对象多态性.doc
- 面向非专业射频测量技术基础.doc
- 靶向制剂研究进展.doc
- 雷雨季节生产组织和处理预案(修改后).doc
- 鞋基本知识.doc
- 鞋子陈列技巧和实例介绍.doc
- 预应力张拉工艺流程(Prestressed tensioning process).doc
- 预应力锚杆(Prestressed anchor).doc
- 预拌混凝土质量教训15例(Quality lesson of ready mixed concrete 15 cases).doc
- 预防医学名词解释通(Interpretation of Preventive Medicine).doc
- 领导力培养(Leadership development).doc
- 预制桩(Precast pile).doc
- 风险管理五节点管理应转化为企业生产力(Risk management five nodes management should be transformed into enterprise productivity).doc
- 预制混凝土静压桩施工的质量控制(Quality control of precast concrete jacked pile construction).doc
- 飞q包格式(Fly Q package format).doc
- 风机轴承故障原因与处理方法(Fan bearing fault cause and treatment method).doc
文档评论(0)