- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
往届安全员考试(The previous safety examination)
往届安全员考试(The previous safety examination)
Safety officer certificate examination C
Radiobuttonlist:
The excavation of 1. wetland areas, for artificial precipitation, fell to the bottom (0.5 to 1 meters) shall be excavated.
2. in the expansive soil area excavation, to do before the excavation (drainage).
3. by reinforced concrete piles, excavation pile concrete standard is reached (design strength).
4. artificial excavation, two operating space should be kept (1 meters).
5. shield machine head every day should detect the concentration of combustible gas, prediction and prevention and control work in order to do, and do (record account).
6. pit (groove) around the drainage ditch and sump should be set up in the (based outside).
7. tools jack pipe in the rectification should be well insulated, the operation of high voltage electric oil pump should be (gloves).
8. car should command unearthed lead car, is strictly prohibited (overload).
9. pipe jacking method in jacking over length (50 m) due to hypoxia, asphyxia prevention measures.
10. pipe jacking construction. The pit of oxygen and acetylene bottle (not allowed to enter the pit place).
The lighting pipe general telecommunication systems 11. (low voltage).
12. support must be installed according to the (slotted support first after last dig) order construction.
13. support should be removed (change to support after the removal of the order of construction).
Less than 14. basis points of foundation pit should not be detected (2).
15. templates and support during the installation process, you must set (can effectively prevent overturning of temporary fixed facilities).
16. template installation must take a minimum height platform is (2 meters).
17. steel tubular (4 meters) above the set horizontal scissors.
18. in the vacant site operation, the operator should (fasten safety belt).
19. pit (groove) minimum distance above the template should be stacked (2 meters) outside.
The angle between the 20. inclined support and lat
您可能关注的文档
- 高二生物(Sophomore biology).doc
- 高中自然地理土壤名词解释(High school geography, geography, soil, noun, explanation).doc
- 高二物理选修3-2(Senior physics elective 3-2).doc
- 高分段考生(Highly segmented candidates).doc
- 高分辨率计算机体层摄影在支气管哮喘检查中的应用(Application of high resolution computed tomography in the examination of bronchial asthma).doc
- 高二语文寒假作业文科班附加题部分(Second grade Chinese language, winter vacation homework, arts class, additional questions).doc
- 高压低噪声径向柱塞泵的结构及性能(Structure and performance of high pressure and low noise radial piston pump).doc
- 高压包的作用(Function of high pressure bag).doc
- 高压旋喷注浆加固处理路堤软基施工技术(Construction technology of high pressure jet grouting reinforcement for soft foundation of embankment).doc
- 高压旋喷技术在沉桩引孔中的应用(Application of high pressure jet grouting technology in bored pile driving).doc
文档评论(0)