- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工组织与进度控制(The construction organization and schedule control)
施工组织与进度控制(The construction organization and schedule control)
Fill in the blanks
1, a job has three future work, its duration is 4D, 5D, 6D, and its latest completion time is 18D, 16d, 14d, the latest completion time of this work is (8D)
2 in an engineering network plan, if a job delays more than the free time difference, it will affect the earliest start of a tight job
3 a 3 tight work before its earliest start time is respectively second, 3, 2 days, the training time was 4,5,3, the first time in this work is (8 days)
4 a drywall engineering volume is 65 cubic meters of time quota for 1.23 days /m3 every day the number of 20 people work with a class system construction, then the construction time for (4) days
5 the technical and economic documents used to plan and guide the construction of the units, from the construction preparation to the final acceptance, are (the construction organization design of the unit works)
6 technical data preparation (1 review drawings 2 signed subcontract 3 4 construction organization design of construction drawing budget and construction budget)
7, the progress plan inspection comparison method has (1 horizontal chart comparison method, 2 vertical progress chart method, 3S shape curve comparison method, 4 banana shape curve comparison method, 5 vanguard line comparison method, 6 network chart cutting line comparison method)
8 after the completion of the previous construction, the whole construction process shall be completed at the beginning of the next construction process (Construction in turn)
9 (parallel construction) is suitable for projects of large scale, long construction period, sufficient time and non metering cost
10 the amount of work completed per unit time in each construction project is known as flow intensity
11 when the division of construction layer is a reasonable relationship between each construction stage number M and the construction process is the number n (M = n)
12 the critical line is in the network trace (
您可能关注的文档
- 影视论文(Film paper).doc
- 影评《活着》张艺谋(The alive Zhang Yimou).doc
- 往届安全员考试(The previous safety examination).doc
- 征地程序(The procedure of land expropriation).doc
- 徐小平美国掀创业风暴栽种梦想比什么都重要(Xu Xiaoping storm lift the entrepreneurial dreams are more important than what is planted).doc
- 征税问题(Tax problems).doc
- 影像学简答题(Imaging short answer).doc
- 循环对称结构的模态分析简介(Modal analysis of cyclic symmetric structure).doc
- 循环水开车(Circulating water drive).doc
- 微元法在解题中的应用(The application of infinitesimal method in solving the problem).doc
- 2025年分红险:低利率环境下产品体系重构.pdf
- 大学生职业规划大赛《应用物理学专业》生涯发展展示PPT.pptx
- 大学生职业规划大赛《新媒体技术专业》生涯发展展示PPT.pptx
- 七年级上册英语同步备课(人教2024)Unit 3 课时2 Section A(2a-2f)(同步课件).pdf
- 七年级上册英语同步备课(人教2024)Unit 2 课时4 Section B(1a-1d)(同步课件).pdf
- 七年级上册英语同步备课(人教2024)Unit 3课时6 project(课件).pdf
- 2025年港口行业报告:从财务指标出发看港口分红提升潜力.pdf
- 2023年北京市海淀区初一(七年级)下学期期末考试数学试卷(含答案).pdf
- 2026年高考化学一轮复习第7周氯及其化合物、硫及其化合物.docx
- 2023年北京市西城区北京四中初一(七年级)下学期期中考试数学试卷(含答案).pdf
文档评论(0)