- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工组织目录(The Construction Organization Directory)
施工组织目录(The Construction Organization Directory)
The outline of construction organization design and the common problems that should be noticed in compiling
?
1, the establishment of the basis (often followed by the status of tender documents; should pay attention to the difference between the implementation of the program and the tender program) 1.1 contract?
?? (name of contract, contract number and date of signing) 1.2 engineering geological survey report?
The name of the engineering geological survey report, the number of the report and the date of the report) 1.3 the effective construction drawings approved by the relevant department
?? (number of construction drawings, date of drawing, approval department, date of approval)?
1.4 projects involving major country or industry norms, standards, rules and regulations, local regulations, Atlas, Atlas (often used obsolete version of the file; should pay attention to the effectiveness of the reference version of the file)?
A list of specifications, standards, and documents
Category? Name? Number or number?
????
?
?
1.5 enterprise ISO9001 quality system standard document?
?? (name of document, number, date of preparation or version number)?
2, engineering general situation (often leakage items, should be explained by design and construction drawings separately) 2.1 project construction overview?
List of general situation of engineering construction?
Project Name: Engineering address? Construction unit? Investigation unit? Design unit, supervision unit, quality supervision department, general contractor, main subcontractor, construction period, contract period, total investment?
What are the main functions or uses of contract works, quantities, sums, works?
2.2 general situation of engineering architectural design (often indicating the omission of items) should be explained in accordance with the contract scope of the construction contract by item by item, and the basic practice of each sub item shall be defined
List of
您可能关注的文档
- 往届安全员考试(The previous safety examination).doc
- 征地程序(The procedure of land expropriation).doc
- 徐小平美国掀创业风暴栽种梦想比什么都重要(Xu Xiaoping storm lift the entrepreneurial dreams are more important than what is planted).doc
- 征税问题(Tax problems).doc
- 影像学简答题(Imaging short answer).doc
- 循环对称结构的模态分析简介(Modal analysis of cyclic symmetric structure).doc
- 循环水开车(Circulating water drive).doc
- 微元法在解题中的应用(The application of infinitesimal method in solving the problem).doc
- 循环系统(circulatory system).doc
- 微博摘录(Micro-blog extract).doc
- 施工放线测量技巧(The construction of line measurement techniques).doc
- 施工组织设计讲座(Department of construction organization design).doc
- 施工考试复习要点(The construction of test points).doc
- 施工资料顺序(The construction of data sequence).doc
- 施工预算与施工图预算的区别(The difference between construction budget and construction drawing budget).doc
- 施工项目管理组织机构(Organization of construction project management).doc
- 旁通阀(Bypass valve).doc
- 旅游景观鉴赏六(Tourism landscape appreciation six).doc
- 施工进度控制考试内容(Construction schedule control test content).doc
- 旋挖桩机 钻头(Rotary pile drill).doc
文档评论(0)