施工预算与施工图预算的区别(The difference between construction budget and construction drawing budget).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工预算与施工图预算的区别(The difference between construction budget and construction drawing budget)
施工预算与施工图预算的区别(The difference between construction budget and construction drawing budget)
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Difference between construction budget and construction drawing budget
1, the use and preparation method of different construction budget for the construction of enterprise internal accounting, mainly calculate the amount and quantity of direct cost; and the construction drawing budget will determine the unit project cost. The construction budget shall be compiled under the control of construction drawing budget value. 2, the use of fixed quotas, the construction budget is based on the construction quota, construction plans budget, the use of budget quotas, two kinds of fixed items divided. Even with a certain amount of the project, in two in their labor and material quota, Jixietaiban consumption quantity has certain difference. 3, the project degree of fineness is different, construction budget than construction drawing budget items are many, the division is fine, the specific performance is as follows. (1) the calculation of the construction budget should be stratified, segmented, sub project calculation, the project than the construction budget. Such as brick foundation, only a fixed budget; and construction quota according to different depth and wall thickness of brick foundation, is divided into six projects. (2) the project quota of construction quota is less than the budget quota. Such as cast-in-place reinforced concrete engineering budget quota for each project are included in the template, steel, concrete and three projects, the construction of a fixed template, steel and concrete were calculated out. 4, calculate the range of different construction budget only calculate the number of required quantity, the direct cost of conditional area or engineering calculation, and construction drawing budget to direct project co
您可能关注的文档
- 征地程序(The procedure of land expropriation).doc
- 徐小平美国掀创业风暴栽种梦想比什么都重要(Xu Xiaoping storm lift the entrepreneurial dreams are more important than what is planted).doc
- 征税问题(Tax problems).doc
- 影像学简答题(Imaging short answer).doc
- 循环对称结构的模态分析简介(Modal analysis of cyclic symmetric structure).doc
- 循环水开车(Circulating water drive).doc
- 微元法在解题中的应用(The application of infinitesimal method in solving the problem).doc
- 循环系统(circulatory system).doc
- 微博摘录(Micro-blog extract).doc
- 微分几何习题及答案解析(Differential geometry analysis exercises and answers).doc
- 施工项目管理组织机构(Organization of construction project management).doc
- 旁通阀(Bypass valve).doc
- 旅游景观鉴赏六(Tourism landscape appreciation six).doc
- 施工进度控制考试内容(Construction schedule control test content).doc
- 旋挖桩机 钻头(Rotary pile drill).doc
- 旅馆设计规范(Hotel design specification).doc
- 旋喷桩施工工艺(Jet grouting pile construction process).doc
- 旋挖钻机在泥岩地层施工的工法规律(Rotary drilling rig in the construction of mudstone formation construction).doc
- 旋转编码器的原理(Principle of rotary encoder).doc
- 无公害洋葱高产栽培技术(Non pollution Cultivation Techniques of onion).doc
文档评论(0)