- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥涵简答题(Brief answer of bridge and culvert)
桥涵简答题(Brief answer of bridge and culvert)
Brief answer of bridge and culvert
1. the method of checking the strength of concrete members by rebound method is briefly introduced.
Answer: the component selection; II test area; the carbonation depth measurement; the springback; the springback calculation; the strength conversion and calculation; the presumption of strength value calculation; the correction results.
2. why should temperature compensation be applied in electrical measurement? How to make temperature compensation.
The change of the resistance of the resistance wire leads to the change of the resistance; the linear expansion coefficient is not equal; the method of compensating film and the method of self compensation.
3. the loading condition of the hinged arch and the location of the measuring points are briefly described.
Answer: the maximum positive moment condition; the maximum negative moment condition of arch foot; the arch foot maximum thrust mode; the positive and negative deflection and the maximum absolute value of the cross neutralization condition; l/4 and l/4 deflection; vault and arch foot section strain.
4. briefly describe the determination method of elongation at strand test.
Answer: loading to extended meter readings for the elongation of 1%, remove the extension, and marked on the test machine under the table between the distance of L1, and then continue loading until the strand break, marked on the working table between the distance of L2, two times the percentage of distance difference plus extended measurement the data is 1%, the elongation of steel strand.
5. briefly describe the basic principle and application scope of reflected wave method.
The vertical vibration of the pile head, the elastic wave propagating down the pile, and the wave impedance interface or the change of the section area of the pile body, will produce reflected wave. According to the reflection information, the wave velocity of piles can be calculated, and the pil
您可能关注的文档
- 探讨建筑工程施工技术的管理(Discussion on the construction technology of construction project management).doc
- 接入节点网中英对照(The network access node).doc
- 接地变压器的作用(The effect of grounding transformer).doc
- 探索者 快捷键(Explorer shortcuts).doc
- 接地极安装标准(Grounding installation standard).doc
- 排水管材的质量控制(The quality control of the drainage pipe).doc
- 接触网工技师练习题论述题(Contact network technician exercises on the title).doc
- 接地网的建设(Grounding construction).doc
- 接地安装标准(Earthing installation standard).doc
- 接触网工技能鉴定复习题---中级工部分(Contact net work skill appraisal review questions - the intermediate part).doc
- 桥隧型接地端子技术规格书.jsp(Tunnel type earthing terminal technical specifications.Jsp).doc
- 桩基工程(Pile foundation engineering).doc
- 桩基检测技术(Pile foundation inspection technology).doc
- 标杆房地产企业产品设计管理与成本控制实战(Benchmarking real estate enterprise product design management and cost control actual combat).doc
- 桩基种类(Pile type).doc
- 桩承台施工工艺标准 (207-1996)(Construction standard of pile cap (207-1996)).doc
- 桩承台梁工艺标准(The pile capping process standards).doc
- 梁桥悬浇法施工(Cantilever casting method for beam bridge construction).doc
- 梁的种类及其区别(Types and differences of beams).doc
- 梁材料的 选择(Selection of beam material).doc
文档评论(0)