民防工程验收(Civil defense project acceptance).docVIP

民防工程验收(Civil defense project acceptance).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
民防工程验收(Civil defense project acceptance)

民防工程验收(Civil defense project acceptance) Guidelines for acceptance and submission of civil defense engineering archives -------------------------------------------------------------------------------- I. rules of procedure: 1. bid object Newly built, rebuilt and expanded all types of single built and attached civil defense construction units. 2. conditions of acceptance (1) all units conforming to the civil defense construction project reporting, supervision and reporting procedures must submit the registration form for civil defense construction project in Shanghai at the same time as they receive and report to the prison. (two) all units must prepare a set of civil defense engineering archives for the civil defense engineering archives department in the beginning of the project construction. When the project is completed, submit a complete, systematic and accurate civil defense engineering technical file to the civil defense engineering archives department. (three) the contents, descriptions and requirements of the project archives submitted by the construction units are as follows: 1, the construction unit shall submit the documents and filing: (1) the catalogue in the catalogue (in accordance with the principle of three elements), for example, the construction unit, the construction unit and the supervision unit (all write the full name) about the quality check list of the technical documents of civil defense engineering.); (2) the quality check list of Engineering Technology (issued by the municipal civil defense record room, signed by the three parties of a, B and supervisor); (3) Civil Engineering Office of city (District) Civil Engineering Office approved the project and relevant approvals; (4) design tasks (if not formed, please indicate in the pro forma table); (5) the design instruction (if not formed or illustrated in the design drawings, please note in the proforma); (6) design calculations (by the municipal civil defense record room hair custody calcul

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档