- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水中墩(Submerged pier)
水中墩(Submerged pier)
Journal
121# pier Hengliaojing bridge double wall pier cofferdam construction scheme (1) 2009-6-28 14:02 (4) reading a: a 16 year old little girl said... | back log list reproduced share copy address comments Zambrotta Gianluca Zambrotta editor
1 project overview
1.1 overview
Hengliaojing bridge across the Huangpu River in Shanghai mainly upstream of the Jinghe bridge cross flow, the pile No. DK31+267.745~DK46+532.240, bridge center pile No. DK038+899.933, length of 15.2645Km, about a 62 degree angle with the direction of the river. 121# pier pile number is DK35 + 498.395, and it is round solid pier. The 120# and 122# piers on the shore are round piers and are located at the flood control wall outside the north and South embankments. Under the condition of navigation, the construction of deep water pier cofferdam, the hoisting of transportation and the cantilever casting of large span suspension basket are all the control nodes of the whole line.
1.2 geology and earthquake
The project is located in the alluvial plains of the lake, the upper quaternary Holocene clayey soil and silt and silty sand, thickness of 20 ~ 50m, the lower Pleistocene clayey soil and silty sand; bridge in the fold and fracture structures are buried in the deep layer of Quaternary strata below the bedrock, no major no adverse influence on engineering geological effect.
The value of seismic basic intensity VII, design earthquake group 1, the peak ground acceleration 0.10g.
1.3 basic features of river course
Hengliaojing is located in Huangpu River, in the territory of Songjiang District, began in the upstream downstream check in vertical Xietang, Liao Jing, full-length 5.6km. The normal water level of the river is about 2.3m. Hengliaojing III navigable river in river management for city river.
The vertical section of the river shows the characteristics of both lower and middle height, and the elevation of the river is generally between -9 and -7m. The depth of both ends can r
您可能关注的文档
- 数控机床论文摘要数控论文(Abstract the NC NC machine tool).doc
- 数控火焰切割机(NC flame cutting machine).doc
- 数控加工工艺设计的主要内容(The main content of NC machining process design).doc
- 数控课程设计总结(Summary of numerical control course design).doc
- 数控答辩(NC reply).doc
- 数控论文(The NC).doc
- 数控车刀(CNC lathe tool).doc
- 数控车削编程特点(The characteristics of CNC lathe programming).doc
- 数控车工考证(Research of CNC lathe).doc
- 数控车床gm指令(CNC lathe GM instruction).doc
- 水利3(Water conservancy 3).doc
- 水利二级建造师考试大纲(Water level two construction division examination outline).doc
- 水利工程-黄泥埠水库除险加固工程进度保证的主要措施(Water conservancy project - the main measures to ensure the progress of the reinforcement project of Yellow River Reservoir).doc
- 气弹簧介绍(Gas spring introduction).doc
- 水利工程考试大纲(Water conservancy project examination outline).doc
- 水利企业的内部控制问题(Internal control of water conservancy enterprises).doc
- 水利水电工程毕业论文(Graduation thesis of water conservancy and Hydropower Engineering).doc
- 水利水电工程施工总承包企业资质等级标准(Standard of qualification for general contracting enterprise of water conservancy and hydropower project construction).doc
- 水利水电工程设计(Water conservancy and Hydropower Engineering Design).doc
- 水利网站大全(Water conservancy website).doc
文档评论(0)