水利工程-黄泥埠水库除险加固工程进度保证的主要措施(Water conservancy project - the main measures to ensure the progress of the reinforcement project of Yellow River Reservoir).docVIP

水利工程-黄泥埠水库除险加固工程进度保证的主要措施(Water conservancy project - the main measures to ensure the progress of the reinforcement project of Yellow River Reservoir).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水利工程-黄泥埠水库除险加固工程进度保证的主要措施(Water conservancy project - the main measures to ensure the progress of the reinforcement project of Yellow River Reservoir)

水利工程-黄泥埠水库除险加固工程进度保证的主要措施(Water conservancy project - the main measures to ensure the progress of the reinforcement project of Yellow River Reservoir) Abstract: Xingan huangnibu reservoir reinforcement project construction by adopting a series of process control and guarantee measures, to ensure that in just 195 days (less than a dry season) in complete reinforcement construction tasks, a typical and exemplary role in the province, the danger of dangerous reservoir reinforcement have carried out large amount of current the reference and guidance of Engineering construction. 1. General situation of Engineering Xingan huangnibu reservoir is a medium-sized reservoir irrigation, flood control, power generation and comprehensive benefit of cultivation. The dam control basin area of 17.83 square kilometers, the total capacity of 17 million 280 thousand cubic meters, the design of irrigation area of 17 thousand and 700 acres, 32 thousand acres of arable land protection, the protection of the population of 76 thousand people, the protection of Xingan County and the Beijing Kowloon Railway and national highway 105 and other important facilities, the geographical position is very important. Reservoir engineering construction in October 1959, basically completed in March 1960 and began to play a benefit, mainly by the dam (including auxiliary dam), spillway, left and right irrigation irrigation power generating culvert culvert and the dam power plant. The project belongs to the second batch of projects invested by the central government. In October 2005, it was approved by the national development and Reform Commission and the Ministry of water resources, with a total investment of 36 million 784 thousand and 200 yuan. Many engineering construction projects and contents, including dam (dam) reinforcement, spillway reinforcement, left and right power irrigation culvert demolition and reconstruction of irrigation culvert blocking dam road, and into the library, on the floor, wat

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档