- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
消防工程安装施工要求(Fire engineering installation requirements)
消防工程安装施工要求(Fire engineering installation requirements)
Sprinkler, alarm valve, pressure switch, water flow indicator and other major system components, whether the national fire product quality supervision and inspection center testing qualified, whether there is proof of detection?.
(2) appearance inspection of pipes and fittings. Pipes and fittings of visual inspection mainly check no cracks on the surface, shrinkage, slag, folding and heavy leather; thread sealing is complete, there is no damage, especially burr; galvanized pipe inside and outside surface of galvanized layer is shedding, corrosion phenomenon; metallic gasket is flexible, without aging quality metamorphism or delamination, are broken and surface defects such as wrinkles; the flange sealing surface is complete and smooth, whether the burr and radial grooves; the thread of the threaded flange is complete, there is no damage.
(3) field inspection of sprinkler head. Check sprinkler site mainly to see whether the nozzle types and specifications meet the design requirements; the nozzle type, the nominal trademark, action temperature, factory and production date of signs is complete; the nozzle appearance has no defects and mechanical damage; sprinkler thread sealing surface of a scar, no burr, lack of wire or wire broken.
Closed type nozzles shall be tested for sealing performance, with no leakage and no damage as qualified. The number of trials shall be 1% from each batch, but not less than 5, the test pressure shall be 3.0MPa, and the test time shall be no less than 3min. When there are two or more unqualified, shall not make this batch of sprinklers. When only one fails, 2% should be checked, but not less than 10. The sealing performance test shall be carried out again, and the sprinkler shall not be used when there is still no conformity.
(4) field inspection of valves and their accessories. Types and specifications for field inspection of valves and accessories of the main valve meets the design re
您可能关注的文档
- 机械设计考试题.(Mechanical design examination questions).doc
- 机械设计考试大纲(Mechanical design examination outline).doc
- 机械设计要求(Mechanical design requirements).doc
- 机械设计通用的技术要求(General technical requirements for mechanical design).doc
- 机械轴(Mechanical shaft).doc
- 机械设计禁忌500例(500 cases of mechanical design taboo).doc
- 机油滤清器(Oil filter).doc
- 机械零件的认识(Understanding of mechanical parts).doc
- 机油(Engine oil).doc
- 机电一体化(Mechatronics).doc
- 消防案列(Fire case list).doc
- 海洋资源与海洋生态保护(Marine resources and marine ecological protection).doc
- 涌水突泥(Gushing and mud bursting).doc
- 消化系统笔记(Digestive note).doc
- 润滑剂在pvc异型材配方中的重要作用(Important role of lubricant in formulation of PVC profile).doc
- 涡轮增压(Turbo).doc
- 液体表面张力的测定(Determination of surface tension of liquids).doc
- 液压传动期考复习题及答案(Hydraulic test review questions and answers).doc
- 液压传动(Hydraulic drive).doc
- 液压传动答案(Hydraulic drive answer).doc
文档评论(0)