- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
淤泥软基处理方法(Method for treating soft foundation of silt)
淤泥软基处理方法(Method for treating soft foundation of silt)
The silt soil physical properties: one is to contain a lot of fine particles and a large amount of organic humus; two is the color of dark grey or dark green, smell; three is the natural water content in 40% ~ 70%, some more than 70%, the void ratio 1.0, natural capacity between 15 ~ 18kN/m3. Mechanical properties: low strength, high compressibility, permeability. Engineering characteristics: low bearing capacity, strength of slow growth, and uneven loading after deformation, deformation rate and stability for a long time, has low penetrability, thixotropy and rheological characteristics of large.
In view of the silt soft soil foundation bearing capacity is low, compressibility, permeability, not easy to meet the design requirements for foundations of hydraulic structures, it is in need of treatment, the five kinds of soft mud treatment method.
1, pile foundation
When the silt layer is thick, it is difficult to a large area of deep processing, can be used to pile reinforcement. While a variety of pile foundation technology diversity, earlier using the cement mixing pile, sand pile, piles, rarely used at present, is a cement mixing pile water cement ratio, slurry transporting amount and stirring times of control and management automation system is not perfect, obsolete equipment, backward technology, poor uniformity and existence of mixing pile stability problem; two is to reinforce the deep soft soil foundation with gravel pile, due to the presence of long duration, large deformation after construction, no longer used for building foundation treatment on the deformation; three is civil building piles foundation has been disabled.
The precast reinforced concrete pile (reinforced concrete pile and prestressed pipe pile) due to strong bearing capacity, investment, quality assurance, speed of construction and so on, has been widely used, such as the design of Longhai City Kok Town Jinshan sluice, the geological condi
您可能关注的文档
- 李宁迷途品牌重塑交企业培训织着销售渠道变革(Lining lost rebranding, training, weaving sales channels change).doc
- 李宁迷途品牌重塑交织着销售渠道变革管理(Lining lost track brand remodeling, intertwined with sales channels, change management).doc
- 李教授—太阳能光伏发电(Professor Li - solar photovoltaic power generation).doc
- 机车简答(Use the locomotive).doc
- 李明光(Mr Kwong).doc
- 李昉等 太平广记 卷第341 鬼二十六(Li Fang Taipingguangji Vol. 341st ghost twenty-six).doc
- 李明和让自然美变年轻管理(Li Ming and let the natural beauty become young management).doc
- 李雨青立体操盘技巧(Li Yuqing stereo trader skills).doc
- 材料力学(Mechanics of materials).doc
- 材料加工设备概论(太阳能电池片设备)(Introduction to materials processing equipment (solar panel equipment)).doc
- 职业技术学院2024级工业机器人技术(安装与维护)专业人才培养方案.docx
- 职业技术学院2024级应用化工技术专业人才培养方案.pdf
- 职业技术学院2024级软件技术(前端开发)专业人才培养方案.pdf
- 职业技术学院2024软件技术专业人才培养方案.docx
- 职业技术学院2024级信息安全技术应用(安全运维)专业人才培养方案.docx
- 职业技术学院2024级新能源汽车检测与维修技术(车辆鉴定与评估)专业人才培养方案.pdf
- 职业技术学院2024级石油炼制技术专业人才培养方案.pdf
- 职业技术学院2024级环境监测技术专业人才培养方案.docx
- 职业技术学院2024级汽车制造与试验技术专业人才培养方案.pdf
- 职业技术学院2024级信息安全技术应用专业人才培养方案.pdf
文档评论(0)