现浇框架结构模板施工(Formwork construction of cast-in-place frame structure).docVIP

现浇框架结构模板施工(Formwork construction of cast-in-place frame structure).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
现浇框架结构模板施工(Formwork construction of cast-in-place frame structure)

现浇框架结构模板施工(Formwork construction of cast-in-place frame structure) Two 、 cast-in-place concrete frame structure template construction Suitable for industrial and civil building, cast-in-place frame, shear wall structure, formwork installation and demolition. 1, operating conditions The template design: according to the project structure and characteristics and site conditions, the design template to woodworking to determine the template layout and vertical and horizontal keel size, number, arrangement and spacing, Liang Ban size and selected hoop column spacing of the support and the template assembly form (on the assembly and prefabricated), connection details. Checking the strength, rigidity and stability of formwork and support. Draw a full set of design templates (template layout, different room block diagram, assembly drawing, detail, parts processing, floor formwork supporting embedded parts layout drawing). The number of templates should be divided into flow sections according to the design of the template, and a comprehensive study is carried out to determine the number of configurations of the template. Play the floor of the wall line, column edge line, floor elevation line and template control line, door and window hole position line, hit floor concrete when the wall column root 200mm wide range, the template bottom mouth has been strictly leveling. The concrete construction seam template before installation, wood formwork construction should be pre hardened cement or loose film will have concrete and mortar surface soft layer chisel to all exposed stones, clean, wash with water, not water dew. Exposed rebar, iron paste, mortar, grease, should be cleaned. Construction carpentry construction team in the installation of wall column template, should clean the surface of the template, brush good isolation agent, brush evenly, not leakage brush. Prefabricated assembly: composite steel formwork, steel frame and bamboo plywood can be prefabricated and assembled i

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档