理正岩土5.6更新内容(Lizheng geotechnical 5.6 update).docVIP

理正岩土5.6更新内容(Lizheng geotechnical 5.6 update).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
理正岩土5.6更新内容(Lizheng geotechnical 5.6 update)

理正岩土5.6更新内容(Lizheng geotechnical 5.6 update) To update the content: Retaining wall: 1. new hydraulic retaining wall design specification (SL 379-2007 A) to calculate the earth pressure; 2. new railway subgrade retaining structure design specification (TB10025-2006) in the calculation of earth pressure; 3. new code for design of highway reinforced concrete and prestressed concrete bridges and culverts (JTGD62-2004); 4. new specifications for design of highway engineering and bridge (JTG D61-2005); 5. new wall material parameters query (highway); 6. added support for a limited range of Coulombs theory of earth pressure; 7. new type bolt, anchor plate retaining wall support ribs tilt; 8. add to the additional concentrated force and the additional force is considered passive earth pressure distribution; 9. new water conservancy industry support all the water retaining wall; 10. new inspection and automatic design of tenon tenon retaining wall function; 11. added support between the base tilt and the foundation and the tenon can coexist; 12. modify the side water level coincided with the top of the wall normal Qi, side water pressure calculation error; 13. modify the back side wall and bottom side unloading bearing plate water pressure calculation error; 14. modify the step type foundation, the horizontal distance between the interface is not the problem of interaction of bolt; 15. improved highway railway industry anti sliding checking, passive earth pressure is calculated as the sliding force; 16. to improve the anti sliding checking, when the sliding force is negative, the safety coefficient of meaningless output still in calculation; 17. to improve the anti overturning checking: water pressure on the influence of the overturning moment according to the principle of treatment is not offset; 18. improved base tilt foundation checking and anti sliding checking; 18. modify the wall section checking, second rupture surface, active earth pressure in checking the problem; 1

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档