福建省浦城县荣华山矿区建筑用凝灰熔岩矿项目(Pucheng County of Fujian Province Rong Huashan mining building tufflava mine project).doc

福建省浦城县荣华山矿区建筑用凝灰熔岩矿项目(Pucheng County of Fujian Province Rong Huashan mining building tufflava mine project).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
福建省浦城县荣华山矿区建筑用凝灰熔岩矿项目(Pucheng County of Fujian Province Rong Huashan mining building tufflava mine project)

福建省浦城县荣华山矿区建筑用凝灰熔岩矿项目(Pucheng County of Fujian Province Rong Huashan mining building tufflava mine project) Pucheng County of Fujian Province Rong Huashan mining building tufflava mine project The environmental impact report. 1 project overview 1.1 existing engineering status (1) geographical location and traffic; Pucheng County of Fujian Province Rong Huashan quarry mining 50 thousand M3 building tufflava mining project located in Pucheng County 358 degrees direction, straight distance of about 12.7km, belonging to Pucheng Xian Yang Zhen Xian Nan Cun jurisdiction. Rectangular coordinates of mining area: X=3103400-3103800 and Y20650800, mining area of about 0.24km2. Mining area, convenient transportation, mining area on the edge of a simple road about 600m to the 205 national highway, to Pucheng County Chengguan about 15km, about 1.5km from Xian Yang Town, convenient transportation. (2) present situation of mining The mine has been mined a little since 2004 and obtained a mining license in January 31, 2005, the number of which is 3507220510001, and the validity is four years. In 2005, it began to be formally mined, mainly using open-pit step mining. The design scale was 50 thousand t/a, and the actual scale of production was 1000 ~ 3000m3/a. Before January 2009, the total amount of aggregate was 10 thousand and 400 m3. Suspended mining since January 2009. 1.2 project status Fujian Province Fujian Geological Brigade sixth units in the preparation of ronghua Pucheng County of Fujian Province mountain building tufflava mine exploitation plan work process found in the original scope of accreditation of inflection point coordinates and field mining positions are not consistent, in order to ensure consistency in mining location and mining area, need to change the mining license, we plan to do card the scope and mining elevation table 1-1. Table 1-1 construction of mining area Inflection number X coordinate Y coordinate Area (km2) Mining elevation E Three million

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档