采油工实操(Actual operation of oil production workers).docVIP

采油工实操(Actual operation of oil production workers).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
采油工实操(Actual operation of oil production workers)

采油工实操(Actual operation of oil production workers) 1. Take water samples 1. Prepare tools, gauges, appliances 2, check the wellhead process, check the injection well, water distribution process. Check the pressure; check the leaks. 3, wash the bottle, open air valve to smooth sideways, 5 ~ 6L/min flow velocity after 3min sampling, using a sample of water, wash with tools to clean sample bottles more than three times, sampling the correct position (no contact with the sampling port); wash washing tool 4, take water samples to the sampling bottle 2 / 3 height, side close strict vent valve; 5. Cover the sample bottle cap, label, mark the number of the well, the sample and the sampling time, and send it to the laboratory, 6. Clean up the yard, clean up the tools and clean the site Open wells 2, flowing well 1, prepare tools, measuring tools, tools and materials; wipe some recording paper 1 pieces of pipe 1 pen 1 thermometer 1 points 1. Check the diameter of the nozzle, check the three corners of the nozzle, no wax and impurities First, preheat the water jacket furnace 20min., open the separator bypass, back pressure valve, the main shut-off valve, the use of valve wrench opening in the right direction Pass the separator oil outlet valve, balance valve and wax removing vent valve. The reverse separator by-pass valve is in correct direction with the valve wrench opening Fourth, the main line is stable, pour into the separator, slowly open the separator inlet valve and turn off the bypass valve Check the process for leakage; water heater outlet temperature reached 50~60 degrees; bypass valve; slow opening separator inlet valve; the use of valve wrench opening in the right direction After the production is smooth, open the oil outlet valve of the separator, adjust the fire. Make the normal production and fill out the report form Shut in 3, flowing well (sweep line) Turn off the water heater, turn off the production valve, the back pressure valve and the main shut-off valve;

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档