钻孔灌注桩施工方法_安全生产技术网(Technology of network safety construction method of bored piles _).docVIP

钻孔灌注桩施工方法_安全生产技术网(Technology of network safety construction method of bored piles _).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钻孔灌注桩施工方法_安全生产技术网(Technology of network safety construction method of bored piles _)

钻孔灌注桩施工方法_安全生产技术网(Technology of network safety construction method of bored piles _) The construction of bored pile is different from that of retaining wall, such as mud wall protection method and full pipe construction method, two kinds. 1) mud protection wall construction method Impact drilling, punching and drilling, rotary drilling, drilling and so on, mud wall construction method can be used. The construction method is: land leveling, slurry preparation, buried steel tube, laying work platform, installation and positioning, drilling drilling, hole cleaning and inspection hole quality, reinforcing cage, decentralization of pouring underwater concrete to pull out the cylinder, check the quality of nursing. Construction sequence (as shown) (1) construction preparation Construction preparation includes selection of drilling rigs, drilling tools, site layout, etc.. The drilling rig is the main equipment for the construction of bored piles. It can be chosen according to the geological conditions and the application conditions of various drilling machines. (2) installation and location of drilling machine; If the foundation of the drilling machine is installed, if it is not stable, the slope of the boring machine, the inclination of the pile and the eccentricity of the pile are easy to be affected, so the foundation should be installed firmly. The slope of the foundation of the formation is relatively soft, can be bulldozed, reinforcement plate in the pad or sleeper. In order to prevent the pile position allowed construction is very important to the set the center position and the correct installation of drilling machine, the rig drilling machine, the first use of the power drill and near the cage with the drill pipe moving roughly position, then Jack rackjacking accurate positioning, the card hole lifting pulley drill bit or fixed drill pipe and casing center in a vertical line, to ensure the verticality of the drilling rig. The deviation of the drill location is not

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档