钻孔灌注桩缺陷处理(Bored pile; defect treatment).docVIP

钻孔灌注桩缺陷处理(Bored pile; defect treatment).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钻孔灌注桩缺陷处理(Bored pile; defect treatment)

钻孔灌注桩缺陷处理(Bored pile; defect treatment) Bored pile is the use of different professional drilling machines, in the foundation of the earth caused by a diameter of circular hole, reach the design elevation, the steel skeleton fall into the borehole, and then through the catheter placed in the hole in the concrete directly in the water filling operations, and the formation of a tree from a rough cylindrical pile base. Because of its strong adaptability, moderate cost and simple construction, it is widely used in highway, bridge construction and other engineering fields. Bridge bored pile belongs to concealed engineering, drilling and pouring concrete are carried out under water, many factors affecting the quality of bored pile construction, how to effectively avoid the phenomenon of broken pile concrete bit dropping and pouring underwater in the drilling process, prevent concrete slag, uneven quality defects how to deal with the quality problem to a proper extent after construction to ensure the quality of the whole project is the people of Luqiao have been discussed, the author combined with the engineering practice, treatment measures for common quality problems in bridge bored pile construction are summarized, for peer exchange. 1 common problems in drilling process and treatment 1.1 deviation hole drilling rig installation, support is not good, pile hole geological structure uneven and other factors, cause drilling machine whole or drill bit in the course of drilling deviation, resulting in partial hole. According to the different causes of deviating hole processing measures are as follows: 1. As the cause of the tilt should first remove the drill rig, check the borehole wall, such as the borehole wall is relatively stable, it should be strengthened within the scope of the construction foundation or increase the support area, and then re install the drill rig, recovery and construction; borehole wall collapse at any time should be possible. Backfill to the original

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档