钻孔灌注桩工程监理对策(Bored pile; construction supervision; countermeasure).docVIP

钻孔灌注桩工程监理对策(Bored pile; construction supervision; countermeasure).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钻孔灌注桩工程监理对策(Bored pile; construction supervision; countermeasure)

钻孔灌注桩工程监理对策(Bored pile; construction supervision; countermeasure) Bored pile; construction supervision; countermeasure The project uses bored piles, the pile length of about 40 meters, more piles, and more than one column, so the construction of pile foundation is difficult and requires high. It is important to control the location of the pile foundation, the determination of the entry rock, the depth of the embedded rock, the thickness of the sediment, the concrete pouring and the top mark of the pile. 1, put the line fixed pile from construction site measurement reference point, in order to avoid the cumulative error. After determination, check by other methods. Pit 2, casing should be perpendicular to the ground, and a pile of concentric, its radius should be greater than the tube radius of 200 mm depth should be more than the miscellaneous fill soil, into the original soil depth shall not be less than 200 mm. 3, tube with 4 ~ 8 mm rolled steel, the design of pile foundation pit diameter than the diameter of 100 mm on the casing should be opened in 1 ~ 2 overflow outlet. Casing center and pile center should overlap the deviation of less than 20 mm, and should ensure that the vertical tube. 4, support should be above 200 mm. After being buried, the surrounding soil is compacted and backfilled with backfill, and the unified elevation of the upper entrance of the retaining tube is recorded. The control is made to control the depth of hole, the cage of steel reinforcement and the unified height of the pile top. 5, rig turntable must be horizontal turntable center, pile center and wheel suspension center should coincide, the maximum deviation is less than 5 mm. 6, the initial drilling, the hole depth of 5m, should check the verticality of the drill pipe, to ensure that the hole verticality of less than 1%, and when all aspects are normal operation, can begin to accelerate drilling. For muddy soil, the maximum drilling speed should not be greater than 1m/ minutes, the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档