- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
岩土力学样采样要求(Rock and soil mechanics sampling requirements)
岩土力学样采样要求(Rock and soil mechanics sampling requirements)
Sampling requirements for rock and soil mechanics - hydraulic ring geology and drilling - China Land Network - professional land, geological and mining site user name
1. sampling horizon
1) Quaternary overburden layer.
2) bedrock weathering fracture zone: usually in the strong, medium and weak weathering fracture zones, respectively, sandstone in each belt is taken as a group, mudstone class is taken as a group, about 6 groups.
3) non coal measures strata: each rock is picked by each group, about 5 groups.
4) the main mining coal seam: requires 30m above the top of the plate to the bottom of the 20m range, systematically stratified sample rock (that is to change the layer to be sampled). General top 3~5 groups, the bottom 1~3 groups.
5) the main coal seams are picked by each group.
2. sampling method
1) the Quaternary overburden is adopted by the earth sampler in the borehole, and is cut from the periphery with a shovel or other tool, and then is gradually cut with a scraper.
2) rock samples are usually taken in cores extracted from boreholes, and the core diameters are not less than 75mm.
3. sample quantity
1) laboratory requirements:
1, compressive strength of 6 pieces, each made of 5 * 5 * 10cm cuboid, that is dry compression 3, wet compression 3.
2 the tensile strength of 6 pieces, each made of 5 * 5 * 5cm cube, dry tensile 3 pieces, 3 pieces of wet tensile.
3 the shear strength of 18 pieces, each made of 5 * 5 * 5cm cube, dry tensile 9 pieces, 9 pieces of wet tensile.
2) the sample taking and the project done:
In each layer of rock, do the project as much as possible, that is, take the mechanical samples to 2m as much as possible. If rock length is not 2m, ask for:
1 each layer of mechanical samples at least 3 blocks, each length is not less than 10cm (only wet compression: 5 * 5 * 10cm
3 pieces).
2 if the length of a single core is greater than 10cm, its cumulative length is greater than 2m, and only 2m.
您可能关注的文档
- 定时器计数器简介(The timer counter.).doc
- 宝宝大便可判断疾病(Baby stool can determine the disease).doc
- 实习参考资料 考试记得准备(Remember to practice reference test).doc
- 宝宝情商培育全面计划表(Baby EQ fostering comprehensive plan table).doc
- 宝贝家族(Baby family).doc
- 实习周记四篇(Practice weekly four).doc
- 实习工作感想体会(Internship experience.).doc
- 宜兴灌浆料(Yixing grouting material).doc
- 实习心得2(Practice 2).doc
- 实习感想(Practice feeling).doc
- 岩土工程与工程地质介绍(Geotechnical engineering and engineering geology introduction).doc
- 岩土工程外文词汇(Geotechnical Engineering Foreign Language Vocabulary).doc
- 岩土工程师实用手册目录(Geotechnical engineer handbook directory).doc
- 岩溶洞穴的生态环境特点与洞穴旅游(The characteristics of the ecological environment of karst caves and cave tourism).doc
- 岳麓书院的对联(Yuelu Academy antithetical couplet).doc
- 峨眉山(Mount Emei).doc
- 崇仁中学2009学年高三一模地理试卷(Chongren high school 2009 year high school geography exam the first mock exam).doc
- 崇明话(Chongming dialect).doc
- 川大 高层建筑结构1646第一次作业(第5次)(Sichuan high-rise building structure 1646 first operation (fifth)).doc
- 崇祯皇帝三个儿子的历史以及大明朱氏族谱(The emperor's three sons history and genealogy of Zhu Daming).doc
文档评论(0)