双钢筋叠合板钢筋绑扎工艺标准 (410-1996)(Double reinforced laminated steel banding process standards (410-1996)).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
双钢筋叠合板钢筋绑扎工艺标准 (410-1996)(Double reinforced laminated steel banding process standards (410-1996))
双钢筋叠合板钢筋绑扎工艺标准 (410-1996)(Double reinforced laminated steel banding process standards (410-1996))
Range
The process standard is applicable to the reinforcement of laminated floors or roof panels of multi-storey and high-rise civil buildings. Suitable for industrial buildings where conditions are appropriate.
Construction preparation
2.1 materials and main equipment:
2.1.1 reinforcement: the grade and diameter of the reinforcement shall comply with the design requirements and shall be free of old rust and grease. The steel must have the factory quality certificate and re examination report.
2.1.2 lashing wire: fire wire No. 20~22.
2.1.3 cushion block: made of cement paste 50mm * 50mm, thickness equal to the design thickness of protective layer.
2.1.4 main equipment: electric welding machine, steel reinforced hook wrench, etc..
2.2 operating conditions:
2.2.1 laminate has been hoisting finished, steel beam has been lashing finished, laminated template has been installed, the wall out of the lap bar has completed renovation inspection according to the requirements of the drawings, and the rust and dirt clean cement slurry. The above items have been completed or pre inspection procedures respectively.
2.2.2 molding laminate reinforced approach, according to the requirement of design specifications, check its shape, size and the number is correct, according to the specified construction plan in place, in accordance with the specifications, location and number were added to pad wood piled up.
Operation process
3.1 process:
Clean the surface and seams, and finishing, binding, binding seam reinforcement reinforcement reinforcement rings, throwing out two-way plate
Quality test of tie bearing, negative bend, short rib
Clean up debris 3.2 laminated plate and slab, according to the requirements of the drawings finishing bottom slab out of bars, see figure 4-25.
Figure 4-25
3.3 long 5 seam stitching binding reinforcement. Double reinforced with the diameter of 5 cold drawn low
您可能关注的文档
- 教师嗓音保健和发声技巧.doc
- 教程:第六课吉他和弦初步和分解和弦练习.doc
- 教育学习题和答案.doc
- 教育游戏软件评价研究现状和存在问题.doc
- 数字图像压缩技术研究和进展.doc
- 文山学院学生篮球运动中造成损伤成因和预防措施郭瑞芳.doc
- 新人教《3.4眼睛和眼镜》同步作业和答案.doc
- 新入职护士考试试题和答案.doc
- 新人教版六年级下册科学计划和教案.doc
- 新型防水涂料研究现状和进展.doc
- 反恐 穿越 秘籍(Terrorism through cheats).doc
- 反思高中英语教学过程中的情感渗透(Emotional penetration process of English teaching reflection in Senior High School).doc
- 双链表增删改查(Double linked list CRUD).doc
- 反渗透工艺(The reverse osmosis process).doc
- 反渗透技术在重金属废水处理与回用中的应用(Reverse osmosis technology in heavy metal wastewater treatment and reuse in the application).doc
- 反渗透浓水处理_广州奥凯(Reverse osmosis water treatment _ Guangzhou okay).doc
- 反渗透膜元件的污染与清洗(Fouling and cleaning of reverse osmosis membrane element).doc
- 发几十部立体电影下载地址(Dozens of 3D movie download address).doc
- 发动机英文翻译(English translation engine).doc
- 发动机润滑系(2010版)(Engine lubrication system (2010 Edition)).doc
文档评论(0)