大工11秋《工程估价》在线作业3(In autumn 11 project appraisal online homework 3).docVIP

大工11秋《工程估价》在线作业3(In autumn 11 project appraisal online homework 3).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工11秋《工程估价》在线作业3(In autumn 11 project appraisal online homework 3)

大工11秋《工程估价》在线作业3(In autumn 11 project appraisal online homework 3) Great works 11 autumn project evaluation online homework 3 1., on the slope, not retaining the retaining plate, retaining the work of the groove of the project volume calculation, the working surface of the C to determine the error in the statement as (). A. increased 15cm working face side rubble foundation B. brick foundation, each side to increase the work surface 15cm C. concrete foundation or cushion shall be supported with formwork, and each side shall be provided with a working face 30cm D. use coiled or waterproof mortar for vertical moisture proof, the work surface is 80cm The correct answer: B Full Score: 4 points: 4 2. when the reinforced concrete foundation has cushion, the protective layer thickness is (). A. 15mm B. 25mm C. 35mm D. 70mm The correct answer: C Full Score: 4 points: 4 3. the bottom width of geosyncline trough shall be no more than (m) meters. A. 2 B. 3 C. 4 D. 1 The correct answer: B Full Score: 4 points: 4 4. the quantity of formwork for cast-in-place reinforced concrete stairs shall be calculated by (). The horizontal projection area of A. exposed face icon size calculation The vertical projection area of B. exposed face size calculation diagram C. actual template The concrete volume of the D. stairs The correct answer: A Full Score: 4 points: 4 5., construction cost information is divided into (). A. systematic engineering cost information and non systematic engineering cost information B. document type engineering cost information and non document type engineering cost information C. macro engineering cost information and micro engineering cost information D. fixed construction cost information and flow engineering cost information The correct answer: B Full Score: 4 points: 4 6. the list code of a sub item is 010302006004, and the list of items in the sub works shall be coded as (). A. 01 B. 02 C. 006 D. 004 The correct answer: D Full Score: 4 points: 4 7. scaffolding

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档