- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工13秋《水电站建筑物》(13 large hydropower station building autumn)
大工13秋《水电站建筑物》(13 large hydropower station building autumn)
Great worker, 13 autumn, building of hydropower station, online test, 2
I. judgment questions
1. the gate is located on the upstream side of the work gate, and the gate and its gate shall be checked and used to stop water. It is required to open and close in still water when it is used.
A. error
B. correct
The correct answer: B
2. hydraulic calculation of pressure tunnels include two kinds of steady flow and unsteady flow calculation.
A. error
B. correct
The correct answer: B
3. the pressure front tank is set at the end of the diversion channel or the non pressure tunnel. It is the connecting structure between the water diversion station and the pressure pipe.
A. error
B. correct
The correct answer: B
4. non pressure intake is suitable for water intake from natural river or reservoir with little change of water level. Its main feature is deep water and no pressure flow.
A. error
B. correct
The correct answer: A
5. the choice of water diversion route in the diversion tunnel requires the tunnel to be the shortest on the plane, and the depth of burial on the face is required to be shallower.
A. error
B. correct
The correct answer: A
6. in the layout of the penstocks, when the factory and the room longitudinal joints, and the water inlet pressure piping in the dam body in every section of the central government, so that the thickness of concrete pipes on both sides of the same, the uniform stress.
A. error
B. correct
The correct answer: B
7. the selection of the pressure piping route shall meet the safety requirements of the operation. The layout of the pipe shall be arranged on the ridge to prevent the landslide or falling stones from damaging.
A. error
B. correct
The correct answer: B
The function of the 8. piers is to fix the steel tube with self weight, and to bear the axial unbalance force caused by the change of the direction and diameter of the steel pipe.
A. error
B. correct
The correct answer: A
9. the
您可能关注的文档
- 氨曲南工艺研究资料和文献资料.doc
- 氨氮实验所需试剂和仪器最新版.doc
- 氮化处理缺陷和原因分析.doc
- 氯和其化合物.ppt
- 材科1-4章习题和答案.doc
- 氧原子在一些富勒烯表面吸附和扩散势能面.ppt
- 氮和其化合物说课.doc
- 氯和其化合物应用.ppt
- 氯和其化合物高考复习资料.ppt
- 毕业答辩PPT 产纤维素酶菌株筛选和酶活测定.ppt
- 大工14春《水电站建筑物》在线测试2(In the spring of 14 building hydropower stations online test 2).doc
- 大工13秋《工程力学(一)》在线作业3(Engineering mechanics work 13 autumn (a) online homework 3).doc
- 大工14春《水电站建筑物》在线测试3(In the spring of 14 building hydropower stations online test 3).doc
- 大工14秋《土木工程概论》在线测试3(In autumn 14 Civil Engineering Introduction online test 3).doc
- 大工14春《通识教育》在线测试合集(General education online testing work through 14 spring collection).doc
- 大工14秋《工程估价》在线作业3(In autumn 14 project appraisal online homework 3).doc
- 大工14秋《水利工程概论》在线测试1答案(In autumn 14 water conservancy project the introduction of online testing 1 answers).doc
- 大庆精神与铁人精神分享(The Daqing spirit and the spirit of iron man to share).doc
- 大底盘高层建筑基础设计施工难点与jccad正确应用(The tall building foundation design and construction difficulties and correct application of jccad).doc
- 大开间灵活性住宅初探(Of the large Bay residential flexibility).doc
文档评论(0)