- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工14春《水电站建筑物》在线测试3(In the spring of 14 building hydropower stations online test 3)
大工14春《水电站建筑物》在线测试3(In the spring of 14 building hydropower stations online test 3)
Great worker, 14 spring, building of hydropower station online test 3
Multiple-choice questions
I. judgment questions (10 questions, 30 points altogether)
1. Plant Phase 1 and stage two concrete are classified according to the installation requirements of the main unit.
A. error
B. correct
Developing options: B
The 2. layer generator determine ground elevation to ensure flood discharge flood not submerged plant.
A. error
B. correct
Developing options: B
3. the surge chamber shall be as far away from the plant as possible to shorten the length of the channel.
A. error
B. correct
Developing options: A
The basic dimensions of the 4. surge chamber are determined by hydraulic calculations.
A. error
B. correct
Developing options: B
5. surge chamber surge calculation assumes that the water level fluctuation in the upstream and downstream of the power station changes evenly during the water level fluctuation of the surge chamber.
A. error
B. correct
Developing options: A
6. in order to mitigate or avoid the harm to the workshop, the workshop shall be arranged in the main direction of the accident water flow when the pressure pipe is laid in the layout of the plant area of the hydropower station.
A. error
B. correct
Developing options: B
7. the upstream surge chamber usually uses the flow acceleration time to determine whether the surge chamber is set.
A. error
B. correct
Developing options: B
Water hammer calculation of 8. series pipe can be simplified to simple pipeline by equivalent pipe method.
A. error
B. correct
Developing options: B
9. in the oil system of the auxiliary equipment of the hydropower station, the turbine oil and the insulating oil can be used in combination, so as to achieve a better auxiliary effect.
A. error
B. correct
Developing options: A
10. to calculate the maximum and minimum water pressure of the pressure diversion system is one of the tasks of the adjustment guara
文档评论(0)