网站大量收购独家精品文档,联系QQ:2885784924

室内设计施工工艺【精校版】(Interior design and construction technology [school edition]).doc

室内设计施工工艺【精校版】(Interior design and construction technology [school edition]).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内设计施工工艺【精校版】(Interior design and construction technology [school edition])

室内设计施工工艺【精校版】(Interior design and construction technology [school edition]) Interior design and construction technology [school edition] The first: start work before the start of the work done 1, whether the ground wall percussion hollowing, such as hollowing require developers to eradicate the redo; 2, kitchen, bathroom, balcony, balcony do closed water test, such as leakage, to urge developers to rectify; 3. Connect the hot and cold water pipe, open the main valve and open the plug one by one to see if the water is through; 4, protect all finished products (such as anti-theft door, visual telephone, doorbell, finished kitchen, gas meter, etc.) protection; 5, carefully check whether the strong and weak circuit patency, floor drain, the water is smooth; 6, carefully check whether the wall beam column askew, and so on. Second: remodeling wall technology 1, first with the cutting machine need to remove part of the cutting out again, do not use a sledgehammer, lest too much vibration affects the removal of the wall; 2, first with a small hammer drill the bottom up and then slowly emptied. The door to dig new door lintel; 3, do not hit parts: load-bearing walls, concrete walls. Third: water production process 1, the hot and cold water pipe is embedded in the wall depth, the distance between the pipe wall and the wall epidermis should be 1cm, and strictly follow the principle of left hot right cold; 2, the outlet must be in strict accordance with national standards, leading spacing, size arrangement, internal and external silk to distinguish; 3, no blockage, connect hot and cold water pipe pressure test pump, pressure 0.8MPa above, no explosion, take, drop, leakage. No sealing wall can be blocked without pressurization test; 4, after tiling, hot and cold water faucet elbow can not highlight the brick surface; 5, after water pressure test, open the main valve and open the plug one by one to see if the connection is blocked; 6, draw accurate water pipe line, to the owner t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档