- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
空调设计顺序(Air conditioning design order)
空调设计顺序(Air conditioning design order)
Design order: first terminal, then host
Design principles: reasonable, economical, maximum operating cost savings
Design scheme and scope of application:
I. end part:
1 、 fan coil system;
Scope of application: General Office, catering and other places
2. Fan coil unit plus fresh air system;
Scope of application: higher office, hotels, restaurants, entertainment and other places
3, all air system;
Scope of application: large bays, such as shopping malls, supermarkets, workshops and so on
Two, host part:
1, screw chiller, municipal or boiler heating;
Scope of application: a dedicated computer room, adequate power, requiring special duty
2, air-cooled units (heating), municipal or boiler heating;
Scope of application: air conditioning area is small, there is no room, no special duty
3, centrifugal chiller, municipal or boiler heating;
Scope of application: air conditioning area is large, there are dedicated rooms, adequate power, requiring special duty
4, lithium bromide chiller (heating), municipal or boiler heating;
Scope of application: power shortage, municipal heat source, and by comprehensive comparison of the economy, a dedicated computer room, the need for special duty
Three, other:
1, one or more systems;
Scope of application: air conditioning area is small, no special room, no one on duty, air conditioning area is larger, but not at the same time, and need to be independent billing and other places
2 、 pipe fan system;
Scope of application: large bay, no dedicated computer room, no one on duty, flexible control, low initial investment
Design procedure:
I. end part:
(1) equipment selection:
1. Calculate the actual air conditioning area;
2, according to the use of location to determine the cold load index, calculate the total design load, according to equipment layout characteristics determine the required equipment quantity, determine the equipment type;
Cold load estimate index:
Adopt combined air conditioner, cycle times
您可能关注的文档
- 电梯短接线号总结(Summary of elevator short connection number).doc
- 电站锅炉结构(Utility boiler structure).doc
- 电网题(Power grid problem).doc
- 电脑上不了网只能上q解决办法(Computer can not network, only on the Q solution).doc
- 电脑上不了网问题总结(Computer not net problem summary).doc
- 电脑使用快捷键(The computer uses a shortcut key).doc
- 电脑不能上网的原因以及解决方法(Reasons why computers can not access the Internet and Solutions).doc
- 电脑变得反应很慢(The computer becomes very reactive).doc
- 电脑图a(Computer graphics a).doc
- 电脑开机各种滴声引起的电脑故障解析大全(Computer startup various drip sound caused by computer fault analysis Daquan).doc
- 空调系统节能与网络集中空调(Air conditioning system energy saving and network centralized air conditioning).doc
- 空调保养(Air conditioning maintenance).doc
- 空间留言祝福语大全)(Space Guestbook).doc
- 空调选购(Air conditioning shopping).doc
- 穿无菌衣、戴无菌手套方法(Wear sterile clothing and sterile gloves).doc
- 穿鞋小窍门(Tips for wearing shoes).doc
- 空间性格(Spatial character).doc
- 窗五金配件的分类及用途介绍(Classification and application of window hardware fittings).doc
- 穿手术衣(Wear an operating gown).doc
- 窗口方案模板(Windows schema template).doc
文档评论(0)