led工艺初步介绍(led工艺初步介绍)
led工艺初步介绍(led工艺初步介绍)
Introduction of LED process
6-23
The main steps in the LED factory is: cleaning a package - pressure welding welding cutting film - assembly - Test - packaging. Packaging technology is particularly important, the following process provides you with a simple understanding of the current LED process.
A chip test, microscopic examination: mechanical damage and small holes whether the material surface.
Two, the expansion chip because LED chip is still closely arranged after dicing, spacing is very small (about 0.1mm), it is not conducive to the operation of the following process. We use the expansion machine to expand the film on the bonding chip, and the LED chip spacing is stretched to about 0.6mm. Manual expansion can also be used, but it is easy to cause chip waste, waste and other undesirable problems.
Three, dispensing at the corresponding position of the LED stent, silver glue or insulation glue. For GaAs, SiC conductive substrates, red, yellow, yellow green chips with back electrodes are employed. For sapphire blue and green LED chips with sapphire insulation substrate, insulation chip is used to fix the chip The technical difficulty lies in the dispensing quantity control, in the colloid height, the dispensing position has the detailed craft request.
Four, preparation of adhesive and dispensing glue is prepared by preparing instead, first put the silver glue to glue on the back of the LED electrode, and then put back with silver colloid LED installed in the LED bracket. The efficiency of preparation is much higher than that of dispensing, but not all products are suitable for sizing process.
Five, the hand thorn piece will be expanded after the LED chip (glue or no glue) placed on the thorn table clamp, LED stent placed under the fixture, in the microscope, with the needle, LED chip one by one to stab the corresponding position. Hand thorn has an advantage compared with the automatic racking, for different chips replaced at any time, suitab
您可能关注的文档
- coreldraw题库(coreldraw题库).doc
- 图表统计在应用问题教学中的尝试(The attempt of chart statistics in the teaching of applied problems).doc
- 图解系列(Graphic series).doc
- 圆的面积---邱子珍(The area of the circle --- Qiu Zizhen).doc
- 土壤污染(soil pollution).doc
- 土建施工员应该知道的数据(The data that the builder should know).doc
- 土建管理(Civil Engineering Management).doc
- 土楼(Tulou).doc
- 土豆的营养价值(The nutritional value of potatoes).doc
- 圣典(Canon).doc
文档评论(0)