加强现场签证管理 控制工程造价(Strengthen the on-site visa management, control the cost of the project).doc
- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
加强现场签证管理 控制工程造价(Strengthen the on-site visa management, control the cost of the project)
加强现场签证管理 控制工程造价(Strengthen the on-site visa management, control the cost of the project)
Strengthen the on-site visa management, control the cost of the project
In the process of engineering construction, the design drawings and construction drawings are not included in the budget, and the site and actual construction of a lot of content. Such as: underground obstacle removal or recovery, force majeure disaster damage caused by engineering measures, changes of geological conditions, the construction site is restricted by various factors which led to the construction conditions change etc.. The expenses incurred for these factors are called extra budgetary fees; some call it spot visa fees. Although the cost of the proportion of the total investment is not big, but if not, strict management loopholes, will lose, total investment will increase. Some people say that some construction enterprises in order to make money and make up for losses are on the spot visa, although this is somewhat exaggerated, but also reflects the importance of on-site visa management. Now, lets talk about our views in the light of past experience.
First, the concept of on-site visa
The visa fee refers to the construction drawings and construction drawing budget, in the construction process of the actual needs of engineering must be carried out and the use of labor and other costs for the project. Generally by construction enterprises to make detailed settlement of the basis.
Two, the on-site visa and the strict division of the involved changes
The construction of a project must have the construction plans, like the designers works, due to various conditions, constraints, often there will be some shortcomings, it is necessary to modify and improve in the construction process, so to design change notice. But it should be noted that the design changes and on-site visas are strictly divided. Belongs to the category of design changes should have the design department issued a notice, the costs incu
您可能关注的文档
- 党在我心中(The party is in my mind).doc
- 入侵检测系统和防火墙(Intrusion detection system and firewall).doc
- 入党积极分子考察表和入党志愿书填写注意事项(Admission list for party activists and notes to fill in voluntary letters for Party membership).doc
- 入口葡萄酒疾速增加的市场成绩剖析(Market performance analysis of rapidly increasing import wines).doc
- 入境手续(Entry formalities).doc
- 入党自传(Autobiography of joining the party).doc
- 全国二级注册建筑师考试大纲(National level two registered architect examination outline).doc
- 全国中医药高等教育学会 - 陕西中医学院(National Association for higher education in Chinese Medicine - Shaanxi University of Chinese Medicine).doc
- 入党15(Join the party 15).doc
- 全国开办图书馆学专业的 高校有那些(What are the institutions of higher learning of library science throughout the country).doc
- 务实的东菱学院(Pragmatic Donlim Institute).doc
- 加菲猫名言(Garfield's famous saying).doc
- 动作(action).doc
- 动态调用对象的属性和方法——性能和灵活性兼备的方法 (转与 装配中的脑袋 )(The properties and methods of dynamically invoking objects - both performance and flexibility (the head in rotation and assembly)).doc
- 动手装电脑(DIY computer).doc
- 动接动(Dynamic connection).doc
- 动漫职业生涯规划(Animation career planning).doc
- 办公椅类测试标准与测试项目(Test standards and test items for office chairs).doc
- 动物营养学课后习题(Animal nutrition after-school exercises).doc
- 动画术语中英文(Animation terminology in Chinese and English).doc
文档评论(0)