某工程造价控制(The cost control of a project).docVIP

某工程造价控制(The cost control of a project).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某工程造价控制(The cost control of a project)

某工程造价控制(The cost control of a project) Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. The stage of cost control of the childrens palace project implementation stage of cost control of a childrens palace project An overview of the project, the childrens palace planned only the main building, construction area of 12317.1 square meters, covers an area of 19820 square meters, the building is divided into one district, two district two parts, the planned duration 254 days. Estimate the project design unit in January 8, 2004 of the project is 50 million 53 thousand and 300 yuan, in the process of project implementation, commissioned by the owners of the project to calculate our center, I proposed in April 5, 2004 revised estimates of the project, the revised estimate project cost 61 million 950 thousand yuan. In the implementation process of the project, the owners consider the people of Suzhou automobile is more and more popular, parents of children must solve the problem of parking, no parking lot will seriously affect the childrens palace to use function, and the limit of space can only be built underground parking lot, by the relevant personnel and three demonstration, finally determined in the childrens Palace North the Square underground parking lot, the owner of the original content is estimated to be 8 million yuan, I in May 10, 2005 on the content of the revised estimate, the revised estimate project cost is 12 million 840 thousand and 700 yuan. Two, the cost control work of our cost control consulting advisory working group from January 2004 began to work, the main work is as follows: 1. To assist the project part of the project bidding work Commissioned by the owners of the cost control work team to assist the owners with a construction project investment advisory center to the main part of the project is a section, two section of interior decoration, electricity, undergr

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档