桥梁工程1(Bridge Engineering 1).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
桥梁工程1(Bridge Engineering 1)

桥梁工程1(Bridge Engineering 1) A glossary 1, the temperature difference in temperature 2, the ratio of rise to span arch bridge arch is calculated vector and calculate the high span ratio, also reflects the rise of arch arch hand force characteristic index 3, the low water level is the lowest level of bitter seasons; high water level is the highest water level flood season river; design flood level is high water level calculated in accordance with the provisions of the related flood frequency in bridge design. 4, arch axis coefficient m: ratio of transverse load strength of GD at the crown and arch foot horizontal load strength gj. M =gd/gj (arch axis coefficient) 5, the cantilever method refers to the set work platform at the pier on both sides, balanced by section to mid span cantilever cement concrete beam, construction method and piecewise prestress. The main equipment is a pair of walking hanging basket, pull anchor in Zhang and pier has connected mobile beam on the whole hanging basket, and binding steel formwork, pouring concrete, prestress are carried out on the. Complete the construction of this section, the basket symmetrical forward each mobile segment, next to beam construction, step forward, until the cantilever beam is completed. Cantilever erection method refers to the setting in the pier hanger on both sides, balanced by section to mid span cantilever beam of cement concrete prefabricated parts, construction method and piecewise prestress. 6, five points close to the legal weight catenary arch axis and the dead load line, according to the whole arch has five points (two points and two 1/4 vault and arch foot arch) dead load line coincides with the three hinge arch axis coefficient determined, called five point method. 7, the transverse load reduction coefficient in bridge design, usually represented a beam of a wheel load on the section of the product value coefficient of M axle load and a load distribution characterization degree, the coefficient m is

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档