浅谈工程造价控制中存在的问题及对策(Discussion on Problems and Countermeasures in project cost control).doc

浅谈工程造价控制中存在的问题及对策(Discussion on Problems and Countermeasures in project cost control).doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅谈工程造价控制中存在的问题及对策(Discussion on Problems and Countermeasures in project cost control)

浅谈工程造价控制中存在的问题及对策(Discussion on Problems and Countermeasures in project cost control) Engineering Engineering Technology Discussion on Problems and Countermeasures in project cost control Yanglin Abstract: in recent years, there are a lot of problems in project cost management in our country, what measures to take In order to make the project cost management continuous improvement? The author from the project decision-making, project design, bidding, construction Analysis and Countermeasures of project cost control problems and the corresponding construction completion and settlement of the five stages in. Key words: project cost control design problem of completion There are 1 problems in the construction project cost control There are 1.1 problems in project investment decision-making stage 1.1.1 in the project proposal stage, usually by the construction unit to the company investment planning department This investment is estimated that the content is very simple, often caused by leakage. 1.1.2 in the feasibility study stage, design units, construction units commissioned survey design A feasibility research report, and the preparation of investment estimation, the estimated investment will be made after approval The maximum amount of project cost. But because of this stage in economic analysis and scheme Lord, the engineering quantity is not clear, so the design phase of the investment estimation, this accuracy is poor, at the same time Because of the construction unit is usually not the investment estimation and cost control and process flow of professionals Seriously study the lack of process and plan; sometimes the construction unit in order to offer the project can be approved requirements The design units deliberately underestimated in the investment estimation, increase the estimation inaccuracy. There are 1.2 problems in the project design stage The combination of 1.2.1 technology and economy is not enough. In practical work, are generally designed for peo

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档