预算容易漏项的(The budget is easy to miss).docVIP

  • 3
  • 0
  • 约 11页
  • 2017-08-22 发布于河南
  • 举报

预算容易漏项的(The budget is easy to miss).doc

预算容易漏项的(The budget is easy to miss)

预算容易漏项的(The budget is easy to miss) In 1, the flat roof insulation roof exhaust steam hole 2, the staircase in embedded iron The scaffold with 3, paint, construction 4, precast concrete plate: plate beam head, concrete transportation and installation 5, bored pile drilling into the rock depth (the project of municipal and highway project quota includes a large gap). 6, indoor installation of pipeline purging is easy to miss 7, the high cost of outdoor pipeline installation 8, the installation of the production and material cost angle The coefficient of 9, spoil the earthwork trench unilateral

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档