- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建模注意(Modeling attention)
建模注意(Modeling attention)
0, the output unit is mm Bonet bridge crack, internal force output unit is KN, the moment output unit KN*m stress output unit Mpa
1, from the CAD to the bridge inside the Bo import section or model, CAD coordinates must be geodetic coordinate system.
2, the bridge inside the global coordinate system is Bo to positive, so when we lose load in the global coordinate system if the contrary we should input negative.
3, from the CAD bridge to Bo guide section, the section in the same layer, different regions with different colors to distinguish the.
4, the use of single phase bridge Bo live load force is not included in the impact coefficient.
5, Bo bridge live load force stage has been included in the shear coefficient of 1.2.
6, calculate the distribution coefficient of bridge deck line distance first distance of the beam transverse force for lever method and rigid crossbeam method to the first beam of deck beam line at the middle distance; for the rigid plate girder deck beam to the first principle for the middle left outer end of the cantilever plate distance is used to determine the various effects in live load online mobile location.
7, when the component is the concrete member, the weight coefficient of input 1.04.
8, through the modified section bridge doctor to modify the section of reinforced, the need to add reinforced check removed, reinforced the need to replace the input in the section can be reinforced to replace.
9, in the construction of input load of construction stage, through the display in the View menu content set will display the permanent load check, so that you can look at the loading position and direction of the input is correct.
10, Bo bridge provides a custom section, but when using a custom section, display and calculation is very slow, need patience.
Provide the material library definition 11, bridge Bo, suggest that you defined before a unified model, or copied to other materials on the computer does not recognize t
您可能关注的文档
- 通讯公告编号 22.pdf
- 通过信给银行合作.pdf
- 遗产解释制度.ppt
- 郑州商城布局与外墙趋势新探索.pdf
- 那么问题也是最受欢迎热门答案.pdf
- 酸雨对作物影响.ppt
- 遵守法律.doc
- 重庆47剧院.doc
- 配方软件BESTMIX.pdf
- 通用名ppt.ppt
- 建筑的消防水箱及消防栓水泵的设置分析(Setting up of fire fighting water tank and hydrant water pump in building).doc
- 建筑符号(Architectural symbols).doc
- 建筑红线及建筑退让(Building red lines and construction concessions).doc
- 建筑材料所有简答题的答案(Answers to all the simple questions about building materials).doc
- 建筑装饰装修管理规定(Provisions on the administration of building decoration and decoration).doc
- 建筑装饰(Architectural decoration).doc
- 建筑论文(Architectural thesis).doc
- 建筑节能资料(Building energy saving data).doc
- 建筑设计5博物馆设计任务书(Architectural design 5 museum design task book).doc
- 建筑设计中常犯的错误!!(A common mistake in architectural design!!).doc
文档评论(0)