- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水中大直径钻孔桩施工工艺(Construction technology of large diameter bored pile in water)
水中大直径钻孔桩施工工艺(Construction technology of large diameter bored pile in water)
I carefully organize the documents, documents from the network
I just sort of
If there is an error
Please check your!
The construction technology of large diameter bored pile
Abstract: in this paper, the construction method of Bored Piles in water along the Jiangqiao B-ray discussed the implementation
And have achieved good results in the actual construction process
Have a certain reference value for the engineering and technical personnel
Keywords: water bored pile construction
at present
Most of the bridge foundation or building foundation using bored pile form
And to the development of large diameter direction
No damage detection means of ultrasonic detection of pile foundation in
It is particularly important to ensure the quality of pile foundation construction
1 project overview
Wenxi 20 contract items of construction project three Jinliwen expressway along the Jiangqiao Qingtian county is located in the Oujiang Wen Xi Zhen Wen Xi Duan
For the design of bored pile foundation
Double column pier
Ribbed abutments
The upper structure of 35m post tensioned prestressed concrete box girder
The force structure form for simply supported continuous
The design for the separation
The left line length of the bridge is 973.5m (K190+055 ~ K191+028.5)
The right line length of the bridge is 983.5m (K190+055 ~ K191+038.5)
The left line were bored 112
The diameter of 2000mm
All located in the Oujiang River
Bored pile 100% was tested by ultrasonic
The export of the East China Sea
Due to the tidal effect
The climax water level is about 4
The general low water is about -1.0m
Drop up to about 5m
Terrain: bridge the contract section along the Oujiang Wen Xi Zhen.
Across the 330 National highway connecting Wenxi tunnel
Undulating bed
Local scour significantly
Geological conditions: riverbed overburden gravel is 2 ~ 10m
The bottom is silt, gravel and weathered tuff
Rich groundwater
Containing quicksand
Due to th
您可能关注的文档
- 手机店开店策略(Mobile phone shop opening strategy).doc
- 手机改装(Mobile phone modification).doc
- 手机旧电池的再利用(Reuse of mobile phone batteries).doc
- 手机显示屏维修与改装(Mobile phone screen maintenance and modification).doc
- 手机记忆卡常识(Mobile memory card common sense).doc
- 手机网站开发技术(Mobile website development technology).doc
- 手绘墙制作方法(Hand painted wall making method).doc
- 手绘墙画制作方法及步骤-家居小窍门(Hand-painted wall art production methods and procedures - Home Furnishing tips).doc
- 手绘墙绘制方法及步骤(Hand drawn wall drawing method and steps).doc
- 手绘壁画介绍(Introduction to hand painted murals).doc
- 水保工作的详细程序步骤及所需环评资料(Detailed procedures, procedures and required environmental assessment information for water conservation work).doc
- 水利工程建设安全生产管理规定(Provisions on the administration of safety in production of water conservancy projects).doc
- 氧化还原反应-第一课时(Redox reaction - Lesson 1).doc
- 水利工程质量检测考试大纲(Water conservancy project quality inspection test outline).doc
- 水力机组(Hydraulic unit).doc
- 水培的一些个人经验(Some personal experience in Hydroponics).doc
- 水工结构笔记(Notes on hydraulic structures).doc
- 水性玻璃漆与油性玻璃漆(Water soluble glass paint and oil glass paint).doc
- 水暖管材分类(Plumbing pipe classification).doc
- 水泥与外加剂相容性(Compatibility of cement and admixture).doc
文档评论(0)