- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新生儿仪设备操作流程
护理仪器操作流程目录
心电监护仪操作流程 …………………………………………………. 1
注射泵操作流程……………………………………………………….. 2
电动吸引器操作流程………………………………………………….. 3
新生儿辐射台使用…………………………………………………….. 4
暖箱蓝光治疗仪使用流程…………………………………………….. 5
氧气筒吸氧操作流程图……………………………………………….. 6
心电监护仪操作流程
注射泵操作流程
电动吸引器操作流程
新生儿辐射台使用
床温传感器探头置于床中央
暖箱蓝光治疗仪使用流程
氧气筒吸氧操作流程图
张家港澳洋医院新生儿科
Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring su
您可能关注的文档
- 换发许可SP认证申请书9页.doc
- 换发许可SP认证申请书空白表.doc
- 换发证程及新表格.doc
- 捷特S型溶胶技术手册.doc
- 换发《药经营许可证》申请表.doc
- 排毒食物集合.doc
- 换发许可SP认证申请书.doc
- 排污费征程序.doc
- 探索传统光型景区转型升级之路.doc
- 排版 空合同.doc
- 第十单元-社会主义现代化建设新时期与中国特色社会主义新时代.pdf
- 第五单元-明清时期:中国版图的奠定与面临的挑战.pdf
- 小学数学 人教版教学课件 6年级上册 分数乘法 第4课时 分数乘分数(2).pptx
- 小学数学 人教版教学课件 6年级上册 分数乘法 第1课时 分数乘整数(1).pptx
- 小学数学 人教版教学课件 5年级上册 多边形的面积 第3课时 梯形的面积.pptx
- 小学数学 人教版教学课件 4年级上册 角的度量.pptx
- 小学数学-人教版教学课件-5年级上册-小数除法-除数是整数的小数除法.pptx
- 小学数学 人教版教学课件 5年级上册 小数除法 一个数除以小数.pptx
- 小学数学 人教版教学课件 5年级上册 可能性 可能性的大小.pptx
- 实验八-验证动量守恒定律.pdf
文档评论(0)