土建工程造价管理的科学控制(Scientific control of civil engineering cost management)
土建工程造价管理的科学控制(Scientific control of civil engineering cost management)
The scientific management of civil engineering cost control
Time: 2011-04-21 15:35:18 Author: order
The introduction: in doing the investment decision-making, design stage of construction project cost control, if the design stage on the project cost out of control, and control in the construction stage and settlement audit stage, is to have the order reversed behavior. Through the layers of decomposition, implementation and management of investment quota control.
Key words: project cost management, cost control
There are 1. civil engineering cost control problems in the process of
1.1 ignore the early stage construction cost control
Do a good job in the investment decision-making, design stage of construction project cost control, if the design stage on the project cost out of control, and control in the construction stage and settlement audit stage, is to have the order reversed behavior.
1.2 civil engineering construction design stage often change
Many construction units to the construction of the project, but also do not fully prepared, the amount of investment in the grasp of the building, standard, design depth and review of the tender documents and contracts of reasonable and perfect degree not strictly, resulting in the construction side side to change, change necessity and rationality without supervision no, the corresponding changes to the losses caused by the restriction of responsibility.
1.3 civil engineering construction technology and engineering cost with close enough
In the construction process of the current, widespread economic ideas and technical personnel of the weak, the design idea of conservative, adopting new technology, new achievements so as to reduce the cost of the concept is not strong, at the same time, cost engineers generally failed to participate in the whole process of engineering construction, only after the review, purely to be controlled from the economic, eng
您可能关注的文档
最近下载
- 期末测试卷(试题)-2024-2025学年人教PEP版(2024)英语三年级上册.docx VIP
- 高二年级第一次月考质量分析化学.doc VIP
- 人教部编版小学语文三年级上册期中质量检测试题(答案+评分标准).pdf VIP
- 小红书2023“家生活”趋势白皮书-青年志&安娜&奥维云网-2023-64页.pdf
- 小学生主题班会 垃圾分类(课件).pptx
- 江西省南昌市八年级上学期期中数学试卷附参考答案.pdf VIP
- QC∕T 948-2013 汽车顶部装载装置.pdf
- 2024年浙江事业单位招聘-宁波慈溪市机关事业单位编外招5人考试备考题库及答案解析.docx VIP
- 风险评估及控制管理流程 2023年ISO15189医学实验室管理体系.docx VIP
- 滴灌在园林绿化中的应用及前景.doc VIP
文档评论(0)