- 1、本文档共34页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
北京地区成人英语考试历年真题分析
2013年真题及答案
Part I Reading Comprehension (30%)
Directions: There are three passages in this part. Each passage is followed by some questions or unfinished statements. For each of them there are four choices marked A, B, C and D. You should decide on the best choice and blacken the corresponding letter on the Answer Sheet.
Passage 1
Questions 1 to 5 are based on the following passage:
For 20 months the wrecked Costa Concordia has been lying on its side near the coast of Giglio,a small Italian island. But on Tuesday, as part of the largest salvage(打捞)operation ever conducted,the large ship was finally moved to the upright position. The next step is for the vessel to be removed from the area entirely.
The Costa Concordia is twice the weight of the Titanic. The ship itself didn’t budge(稍微移动)for the first three hours of the operation, Sergio Girotto told reporters. He and other engineers worked for 19 hours before Concordia was declared completely upright.
The Costa Concordia capsized on January 13, 2012,after its captain, Francesco Schettino,brought the ship too close to the shore. The ship hit coastal rocks, which caused serious damage and allowed water to pour in. (76) Most of the 4,200 people on board made it to land safely, but more than 30 people were killed in the disaster. Two people remain missing. The Concordia’s captain is currently on trial for causing a shipwreck and abandoning his ship.
The operation to right the ship is called parbuckling. While parbuckling is a standard operation to right capsized ships,it has never before been used on such a large ship.(77)Workers had been waiting for favorable weather conditions to undertake the operation. On Monday,authorities gave the final go-ahead.
The process was expected to take no more than 12 hours. But problems with the large system of steel chains caused delays. Engineers worked through the night using cables and metal water tanks to roll the ship onto special platforms.
The Concordia is expected to be pulled a
您可能关注的文档
- 化工原理,华南理工,吸收-2分析.ppt
- 化学:燃烧与灭火分析.ppt
- 化工制图7标准件和常用件分析.ppt
- 化工原理下册复习分析.ppt
- 化工原理(下)复习整理分析.ppt
- 化工原理下册第二章吸收10.27分析.ppt
- 化工原理作业答案分析.doc
- 化工原理实验传热实验分析.docx
- 化工原理实验思考题吐血整理分析.doc
- 化工原理吸收分析.ppt
- 中国国家标准 GB/T 45390-2025动力锂电池生产设备通信接口要求.pdf
- 中国国家标准 GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型.pdf
- GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型.pdf
- 《GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型》.pdf
- GB/T 10184-2025电站锅炉性能试验规程.pdf
- 海尔智家股份有限公司海外监管公告 - 海尔智家股份有限公司2024年度环境、社会及管治报告.pdf
- 上海复旦张江生物医药股份有限公司2024 环境、社会及管治报告.pdf
- 中国邮政储蓄银行股份有限公司中国邮政储蓄银行2024年可持续发展报告.pdf
- 豫园股份:2024年环境、社会及管治(ESG)报告.pdf
- 南京熊猫电子股份有限公司海外监管公告 - 2024年度环境、社会及治理(ESG)报告.pdf
最近下载
- 骨科无菌术 手术区域的准备.pptx
- 《海岸带生态系统现状调查与评估技术导则 第7部分:牡蛎礁》(报批稿).pdf VIP
- GB4943-2001 信息技术设备 安全 第1部分:通用要求.pdf
- 基于舞弊风险因子理论的柏堡龙财务舞弊案例研究.pdf
- 《海岸带生态系统现状调查与评估技术导则 第5部分:珊瑚礁》(报批稿).pdf VIP
- 建筑施工安全风险辨识和分级管控指南、台账、企业安全风险分级管控清单.docx VIP
- 2025年施工员考试题库及完整答案【名师系列】.docx VIP
- 2025年施工员考试题库附完整答案【夺冠】.docx VIP
- 2025年白蚁防治员岗位职业技能资格知识考试题库(附含答案).docx
- 国际护士节护理操作技能竞赛理论题库.docx
文档评论(0)