110吨电炉余热回收系统安全运行规程(Safety operation regulation for waste heat recovery system of 110 ton electric furnace).docVIP

110吨电炉余热回收系统安全运行规程(Safety operation regulation for waste heat recovery system of 110 ton electric furnace).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
110吨电炉余热回收系统安全运行规程(Safety operation regulation for waste heat recovery system of 110 ton electric furnace)

110吨电炉余热回收系统安全运行规程(Safety operation regulation for waste heat recovery system of 110 ton electric furnace) Safety operation regulation for waste heat recovery system of 110 ton electric furnace System put into operation 1. Before the whole system starts, the operator on duty first checks whether the manual valves are opened, and whether the drum and regenerator levels are normal; 2 、 check and confirm whether the fan high voltage frequency conversion system is switched on, whether the control switch on the frequency converter cabinet panel reaches the remote position, whether the water pump, the valve and the instrument control power supply are electric or not; 3, start the main control room computer, check whether the normal operation of the system, the display screen, and the flue gas waste heat utilization process monitoring picture (picture), recovery and utilization of waste heat detection control screen, the monitor screen, fan alarm screen, display data, indicating whether the normal state parameters on the screen, switching between picture the mouse button, click on the corresponding button can enter and display; 4, under normal circumstances, the computer screen of the valve, pump control should be centralized (remote) control state; 5. When the system starts, make sure the electric furnace cover is in the swing state; 6, first check whether the inverter is ready, inverter without alarm signal, no fault signal, no accident of high voltage motor signal, click on the computer screen in the start button, the fan can be started, click the stop button, the fan stops running; In 7, the fan control screen has a low frequency input window and a high frequency input window, prior to the frequency set, when the furnace cover is screwed out, leaving the furnace, the low frequency wind machine to set a good rate of operation, when the furnace cover is screwed in, fan in order to design high frequency set operation. When the inverter fault signal or inverter alarm signa

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档