erp知识点(ERP knowledge points).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
erp知识点(ERP knowledge points)

erp知识点(ERP knowledge points) The development of 1. ERP: the order point method this method is simple and extensive, suitable for single product, simple structure, material demand is relatively continuous and stable business, and is not suitable for a wide range of products, complex structure, material demand varies with the number of products and delivery of enterprise. The material requirement planning stage: the characteristics of the time period to determine the material demand and demand time, solve the production need what, what, what are the existing, what is missing, when the problems need to be. Closed loop material requirement planning phase: solving the problem of plan and control. The manufacturing resource planning stage (MRPII): Based on maintaining the original closed-loop MRP on the increase of financial information and procurement, production, sales integration, increased to reflect the enterprise management goal of the long-term development of the business planning; reflection of product outline of production planning, logistics and capital flow organically, establish the system simulation and other functions. Enterprise resource planning (ERP): 1. integrated functions beyond the MRPII range. 2. support a hybrid manufacturing environment. 3. support dynamic monitoring capability. 4. support open client / server computing environment. 2. order point calculation: order quantity (OP) = daily average material consumption * purchasing lead time + safety inventory 3. concepts of independent demand and related needs: Answer: independent requirements of the material refers to the amount of material demand and demand time, and other materials demand and demand time is not directly related. Materials related to demand refer to the quantity and demand time of these materials, which is directly related to the demand and demand time of other materials. 4. enterprise value chain A: the value chain is the whole organized series of activities from the raw material

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档